My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004/12/15 Council Agenda Packet
>
Council Agenda Packets
>
2004
>
2004/12/15 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2017 12:28:21 PM
Creation date
1/20/2017 12:27:24 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/15/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 0 3 <br /> PROJECT TITLE: <br /> Final Acceptance X Consent COUNCIL BILL# <br /> Mer-Con, Inc. Action Originating Department Public Works <br /> East Everett Pedestrian First Reading Contact Person Terry Henkg^ <br /> Walkway, Stage 2 Second Reading Phone Number 425-257-8928 <br /> Total Amount Due to Third Reading FOR AGENDA OF Dec. 15, 2004 <br /> Contractor: Public Hearing <br /> $241,284.80 Initialed by: J'711 <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s) Approval <br /> See Vicinity Map Bid: 10/21/03 Final Contract Voucher Public Works <br /> Award: 11/12/03 Certification, Certificate <br /> C.O. #1: 9/20/04 of Completion, Final <br /> Estimate, Vicinity Map <br /> Amount Budgeted $ 241,284.80 <br /> Expenditure Required $ 241,284.80 Account Number(s): PW2696-2 <br /> Budget Remaining <br /> Additional Required <br /> DETAILED SUMMARY STATEMENT: <br /> The general contractor, Mer-Con, Inc., completed the East Everett Pedestrian Walkway, Stage 2 project in <br /> accordance with the plans and specifications and to the satisfaction of the Public Works Department. <br /> The amounts paid the contractor under this contract are as follows: <br /> Amount Paid to Date: $ 229,220.56 <br /> Retainage Withheld: $ 12,064.24 <br /> Total Amount Due to Contractor: $241,284.80 <br /> RECOMMENDATION (Exact action requested of Council): <br /> Accept the East Everett Pedestrian Walkway project as complete and authorize the Mayor to sign the <br /> Certificate of Completion releasing retainage in the amount of$ 12,064.24. <br /> 4 <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.