My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004/12/15 Council Agenda Packet
>
Council Agenda Packets
>
2004
>
2004/12/15 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2017 12:28:21 PM
Creation date
1/20/2017 12:27:24 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/15/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINAL CONTRACT VOUCHER CERTIFICATION <br /> 0 <br /> 'ONTRACTOR: Mer-Con. Inc. ADDRESS:P O Box 1303 <br /> 'TTY: Maple Valley STATE: WA 98038 DATE: September 28, 2004 v <br /> 'ROJECT TITLE: East Everett Pedestrian Walkway, Stage 2 WORK ORDER NO. PW2696-2 <br /> )ATE WORK COMPLETE: September 1, 2004 FINAL AMOUNT: $ 241,284.80 <br /> CONTRACTOR'S CERTIFICATION <br /> , the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work performed <br /> nd material furnished to the City of Everett, that the same or any part thereof has not been paid, and that I am <br /> uthorized to sign for the claimant; that I have not rented or purchased any equipment or materials from any <br /> mployee of the City; I further certify that the attached final estimate is a true and correct statement showing all the <br /> nonies due me from the City of Everett under this contract; that I have carefully examined said final estimate and <br /> inderstand the same and that I hereby release the City of Everett from any and all claims of whatsoever nature <br /> vI ay have, arisin out of the performance of said contract, which are not set forth in said estimate. <br /> vhich <br /> r <br /> CTOR TITLE _O�P MSR�� <br /> vier-Con, Inc. �• ,�'1 <br /> �S `ONq;-..o�►► <br /> ;II, c `• d •nd swo t'. be ore p5 NOTARY V,; ►►/ <br /> `1 • .y.of L.,. .. i :0 --- : S <br /> �(� Notary Public �, //►� i PUBLIC ' <br /> a,d for the State of Washington,residing at '' /L' v f i / /II1 y Sr,9.p�,.•:' <br /> ‘‘ WAS <br /> PUBLIC WORKS DEPARTMENT CERTIFICATION <br /> Certify the attached final APPROVED Date: Z_l--(:71-/ <br /> stimate to be based upon actual <br /> neasure -id's and to .e true and correct. <br /> Con ction Manager Utilities Director <br /> Terry Henke Tom Thetford <br /> INSTRUCTIONS <br /> 'he Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all subcontractor's <br /> gents and forwarded with the Final Contract Voucher Certification. <br /> :ontractor's CIaims, if any, must be included and the Contractor's Certification must be labeled indicating a claim <br /> ttached. <br /> revised 9/94 <br /> h 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.