My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
208 BARBARA LN 2016-01-01 MF Import
>
Address Records
>
BARBARA LN
>
208
>
208 BARBARA LN 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2017 12:08:40 PM
Creation date
1/23/2017 12:08:21 PM
Metadata
Fields
Template:
Address Document
Street Name
BARBARA LN
Street Number
208
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBL/C /�I/O/�X5 � <br /> � o <br /> April 15, 1992 <br /> Lam Elledge <br /> 208 $arbaza Lane <br /> �,verett, WA 98203 <br /> Subject: Barbara Lane Sewer Main <br /> Dear Mr.Elledge: <br /> Thc sewer main in Barbara Lane has been completed and accepted by the Ciry. <br /> This sewer main abuts your�,roperty and is now ava�lable to serve your property. <br /> City codes require that all pro erties within City limits that are sr.nred �y on-site <br /> wastewater treatment systems �that is private septic tanks) and abu[ a public sewer <br /> main, must connect to a public sewer main withm 30 days of the public sewer main <br /> bein8 acapted by the City. Our records indicate that you have not connected to the <br /> pubLc sewer main in Barbara Lane. <br /> The Purpose of this letter it to officially provide notice that you must connect to the <br /> public sewer main within b0 days of the date of this letter or reaive certi5cation <br /> from the Department of Health that your septic tank system is functioning properly. <br /> If the Health District certifies your septic tank systern, you can delay connectmg to <br /> the public sewer main for up to five years after the date of this letter. <br /> You should also be advised that the City will waive the 5471.h0 sewer connection fee <br /> that normally applies to new sewer connections for up to on� year aher the date of <br /> this letter. After one year beyond the date of this letter, the <br /> 5471.00 sewer connection charge will be collected at the dme of sewer permit <br /> issuance. <br /> I realize that it could be difficult to arcan�e financing within 60 days. If you do have <br /> difficulties obtaining financing for your s�de sewer connection, please notify me in <br /> writing or by phone at 259-8800 prior to the 60 day deadline. The deadline will <br /> likely be extended if a concened effort is being made to obtain financing and you <br /> can commit to completing your sewer connection within a reasonable time period. <br /> If you have any questions regarding this, feel free to call me at 259-8800. <br /> Si c ely, <br /> ,U ,���`��j�ll��--�' <br /> Daniel J. Mat�faY, P.E. <br /> Utilities Eng�eer <br /> cc: Larry Crawford <br /> V�:OM10�[LL NAL�71 <br /> CITV OF EVERFTT• '77l1� �a�l�. cneer . FvmnN �nrA oqon�. rona� �so.aonn . F�� iena� �co.0000 .m <br />
The URL can be used to link to this page
Your browser does not support the video tag.