Laserfiche WebLink
r,�:a: <br />CI108-002(6905 Be.e�ly BNd) <br />A�qust 7, 21111 <br />9. Provide insulation baffle per 502.1,4.5 WSEC; show requirements on plans. <br />10, Provide detail of roof truss connection to double top plate capable of transferring loads <br />from roof diaphragm to walls. <br />11. Show how headers are insulated. <br />12. Show attic ventllation calculation and show required ventiladon on plans and elevation. <br />13. Specify all components in sectfon views (ncluding roof sheathfng and motsture barrier, <br />and wall sheathing and moisture barrier. <br />14. Specify roof overframing where new roof extends over the existing structure. <br />Please prepare a response letter showing where each item in this correction letter is <br />addressed on the plan set. <br />Upon resubmittal of the drawings, your application will be given priority and plan review will <br />recommence. <br />All required submittals shall be of sufficient detail and contain sufficient informatlon to ensure <br />that the proposed str�cture will be constructed in compliance with all adopted codes. <br />Sincerely, <br />�� <br />Jeff Hefl an <br />Development Technician <br />425-257-8976 <br />Email: iheilmanClaci.everett.wa.us <br />�2 <br />ykrollltWMNnwNC1f0&002 (6905 Be�afy bM1d) <br />