Laserfiche WebLink
c�y or �y��ood <br />TCILynnwood Secondery Hub <br />Site DevAlop►nsnt Informadon <br />Geotechnical Reao�t: None required. Building will have perimeter concrete footings. <br />StorrNSurface Water Drainaae: The site development vinll not significandy impact <br />drainage orrunofl. <br />New Impervious Areas: <br />Building Ar�a: 60 Square Feet <br />Concrete Generator Pads and Entrance Pad: 104 Square Feet <br />Parkina: One crushed gravel parlcing stall will be provided on the site with a gravel <br />access drive. <br />Schools: PJot applicable. <br />Traffic Studies: Not eppliceble. <br />This project description and site development information has been included in order <br />to assist those reviewing the attached application. This description is intended darify <br />any questions that may arise during the review process. Hopefuily this effort to avoid <br />confusion will eliminate untimely delays. <br />Thank you, <br />IBI GROUP <br />Brian Lemon <br />Page 3d 3 <br />