Laserfiche WebLink
Hans Culmback - 2 <br />August 29, 1973 <br />12. Install gutters, downspouts, and splash blocks. <br />13, Rracp house roof rafters properly to adequately <br />support roof. <br />14. Install new roofing. <br />15. Install attic ventilation. <br />16. Correct roof sheathing at chimney. <br />17. Replace all rotten trim. <br />18. Install waterprotf wainscot at tub. <br />10. Install balances in windows, replace broken and rotten <br />sash. <br />20. Replace framing which supports ceiling joists. <br />21. Verify that plumbing and electrical work meet ex. sting <br />csdea. <br />Sincerely <br />John H. Farrens, Jr. <br />Inspection Supervisor <br />J1IF/mt <br />