Laserfiche WebLink
i <br /> ie Cover measures tvill be implemented, and seasonal special provisions shall be required. <br /> . The project shall be phased as follows: <br /> ` CONSTRUCTION SEQUENCE: <br /> � 1. Arrange for and attend pre-conslruction meeting with the City of Everett. <br /> l 2. Flag or fence clearing limits. <br /> I3. Construct construdion entrance. <br /> q. Install temporary siit fence. <br /> I5. Install catch basin inlet protection on all existing basins to remain that will be I <br /> affec[ed by construction. <br /> I 6. Grade and insfall temporary construction entrance. <br /> r <br /> 7. Commence with demolition of exis[ing site structures to be removed. <br /> Ie. Ciear and grade site. <br /> � 9. Maintain erosion control measures as site work progresses, in accordance with City <br /> of Everett s[andards and manuFacturer's recommendations. Relocate ESC measures <br /> or install new measures as site conditions warrant. <br /> I 10. Cover all areas that will be unworked for more than 7 days during the dry season <br /> and 2 days during the wel season witli straw, wood fiber mulch, compost, plastic <br /> sheeting, or equivalent. <br /> I11. Seed or sod areas to remafn unworked for more than 30 days. <br /> I12. All ESC measures shall remain until the site is completely stabilized. <br /> 5.0 ANALYSIS AND DESIGN OF REQUIRED RUNOFF CONTROL BMPS <br /> � Fiow control and water quali[y is not required for this proJect. Existing conditions and proposed <br /> ' improvements fnformation was provided to the City of Everett(Souheil Nasr) for capacity review <br /> on Thursday, October 9, 2008. Due to minimal change from existing conditions to proposed <br /> Iconditions, flow control is not required. (See November 10, 2008, email below). <br /> 5.1 Treatment Control System <br /> ! This project is exempt from flow control. <br /> I <br /> I <br /> I Stormwa[er Site Plan O Q : O <br /> Evcrett Communiry College <br /> Topper Parking Lo[ 3 <br /> 208221.10 <br /> I � <br />