Laserfiche WebLink
i <br /> I2.2 Post-Development Conditions <br /> I The site improvements will be demolished, cieared, and re-graded for the construction of a <br /> 34,432-square foot asphalt concrete parking lot. <br /> I In the proposed condition, access will be off Broadway Avenue from two driveways located in the <br /> north and south sections of the parkinq !ot. See Appendix A, Exhibit 2B. <br /> Onsite utilities wiil consist of slorm drainage piping and water for irrigalion. <br /> IStormwater facilit(es are proposed lo collecf and convey developed stormwater runoff. 'fhese <br /> facilities are described in Section 5.0 0(this report. <br /> I3.0 OFFSITE ANALYSIS <br /> I3.1 Downstream Analysis <br /> Site discharge will enfer the city II-inch combined sanitary and storm system in Broadway Avenue <br /> � at two points, one at a new manhole located at the approximate in[ersection of North Broadway <br /> and Broadway Avenue, and one approximately 232 feet north. Flow continues north in a closed <br /> 8-inch concmte sewer pipe. Flow eventually enters a sanitary sewer treatment plant. No <br /> adverse impact to the downstream system is anticipated because proposed stormwater runoff <br /> I will enter a ciosed combined storm and sanitary system, and lhe discharge points and peak fiows <br /> are approximately the same as in the pre-developed condition. <br /> I3.2 Upstream Analysis <br /> The relatively tlat nature of the topography precludes significant offsite contributory runoff to the <br /> � site. Runoff to the east is contained within the street storm system in Broadway Avenue. Runoff <br /> (rom the properties to the norlh and south foliow the natural flowpaths east toward Broadway <br /> Avenue. Runoff from propetties to the northwest colleds in an alleyway and flows toward 10"' <br /> Street. The only appreciable tributary runoff would be from the residential properties directly <br /> I west of the site, approximately 0.7 acre. These properties slope loward the site at approximalely <br /> 1 to 2 percent. Due the relatively flat slopes, it is anticipated tliat most runoff will be absorbed in <br /> the vegetation along the eastern portions of thesc lots. Tributary runoff to the site is anticipated <br /> Ito be minimal. See Appendix A, Exhibit 3. <br /> 4.0 ANALYSIS AND DESIGN OF REQUIRED EROSION AND <br /> ISEDIMENT CONTROL BMPS <br /> 4.1 System Description <br /> l • Construction entrance will be provided to reduce the amount oF sediment transported onto <br /> parcel roads by vehicles or equipment. , <br /> ( • Filter Fabric Fence will be provided along the downstream perimeter project dearing limils <br /> � to capture sediments from impacting downstream propetties or roadways. <br /> I • Catch basi� inlet protection wiil be placed on all offsite catch basin inlets affected by <br /> construction activities. ARer insta0ation of onsite catch basins, inlet protection will be <br /> provided as work progresses. <br /> I StonmvaterSitePlan QQOO <br /> Evcrett Community Colle9e . <br /> Topper Parking Lot . <br /> � 208221.10 � <br />