Laserfiche WebLink
. improvements shall be w�npleted, approved and warranted befoi� the Occupancy Pertnit is <br /> " issued/final approval is granted. <br /> 16. Prior to the issuance of permits, traffic mitigation fees shall be remitted in accor�ance with the <br /> City of EveretYs 7raffic Mitigation �Jrdinance. <br /> 17. Any grading/fill on this site shall be done so as to not impact the surrounding properties. <br /> 18. City of Everett 3uilding Permits are required for the change of use. The project must comply <br /> with the requirements of the proposed use. <br /> 19. Lack of comment on the plar,�submitted with the application does not constitute approval of <br /> these plans. <br /> 20. City streets and alleys are to be kept clear of dirt an�debris at all times during construction. <br /> Dust suppression and street cleaning must occur as directed by the Public Works Inspector. <br /> 21. Any broken or damaged sidewalk shall be repaired/replaced per the City Public Works <br /> Inspector. //��� <br /> �' �' Date: � a O <br /> Ilan Giffe <br /> Direct , lanning and i;ommunity Development Department <br /> This is an administrative ciecision appealable to the City's Land Use Hearing Examiner. Appeals of this <br /> decision must be filed within 14 calendar days of the date the decision is signed. If you have questions <br /> regarding this proposal or wish to file an appeai, please contact Becky Fauver, City of Everett Planning <br /> Department, at (425) �57-7281. <br /> �3 <br />