Laserfiche WebLink
�as� 3 or s <br /> connection. See City of Everett standard detaii 604 on this sheet." <br /> Removed detail 2. <br /> Replaced detail 1 with COE standard detail 604/ <br /> C6.0 <br /> Included COE standard details 305A, 306, 307, 316, 403, 410,610 and 611 <br /> The only item that I had added that was not per your comments was the addition of the floatable <br /> material separator and gas trap within the last catch basin . This was as per AutoZone's request <br /> to prevent any gsses from creating a odor problem on site. <br /> The plans can be viewed or download at the foliowing link. If you could please take a quick Iook <br /> at the plans and let me what you would like to have changed if anything then I will have copies <br /> made and get the plans up to you for your final review. Also if you could let me know the number <br /> of copies that will be required on the plans that would be great. <br /> http:!/www.mc2-inacom/Downloads/GuesUTrans(edEveretUtverettAutoZone.pdf I <br /> Aaron Kulp, EIT <br /> MC Squared, Inc <br /> 1235 East 4th Ave <br /> Olympia, WA 98506 <br /> (360)754-9339 <br /> -----Original Message----- <br /> From: Paul McKee [mailto:PMckee@ci.everelt.wa.us] <br /> Sent: Wednesday, February 23, 2005 11:37 AD1 <br /> To: Aaron <br /> Subject: RE: Everett AutoZone <br /> Hi Aaron, <br /> My plan review is done—see the attached 'Autozone PR' PDF. I didn't mark up the C1.0 <br /> sheet because it seems to have been pulled from a Snohomish County job. There are <br /> several references to other agencies in the text. Please modify or delete as necessary <br /> and make reference to sections of the City of Everett'Design and Construction Standards <br /> and Specifications for DevelopmenY where appropriate. Please put our"Required Notes <br /> on Pians"from the manual on C1.0 as follows: <br /> Storm: <br /> 4•2.7 REQUIRED NOTES FOR STORM DRAINAGE PLANS <br /> 1. No part of the drainage system shall be covered, concealed or put into use until it has <br /> been inspected, <br /> tested, and accepted by the City of Everett. <br /> 2. All work and material shall conform to ihe City of Everett Standards and Standard <br /> Specifications of <br /> WSDOT/APWA. <br /> 3. Approximate locations of existing utilities have been obtained from available records <br /> and are shown for <br /> convenience. The contractor shall be responsible for verification of locations and to avoid <br /> damage to <br /> any additional utilities shown. If conFlicts with existing utilities arise during construction, <br /> the coNractor <br /> shall notify the Pubiic Works Inspector and any changes required shall be approved by <br /> the Ciry <br /> Engineer prior to commencement of related construction on the project. <br /> 4. All storm systems within the public right-of-way or in easements must be staked by <br /> survey for line and <br /> grade prior to stariing construction. <br /> 2/25/200J <br />