Laserfiche WebLink
MENE(��S AMCRIChN INSii1UlE Of Af�CNifCCiS <br /> � �\ B.CRAIG iHOMPSON <br /> %� K.JOHN JONES <br /> �� MICHAEL L.BARTHOL <br /> � � � ADAM 8.CLARK <br /> �� �� THOMAS P.HUDSON <br /> " TIM JEWETT <br /> �. � � � �> ���� �� DYKEMAN �oE�o.���EM� <br /> �� � A.GARV O'LEARV <br /> ,nRCHITECTS 11iOMAS M.TREGWAY <br /> PAUL D.TURMALA <br /> � TIM N✓IETMEYER <br /> November 22, 1999 <br /> Kirk Brooks RE: North Everett Bartell Drugs <br /> City of Everett 98083/C1 <br /> Engineering/Public Services Dept. <br /> 3200 Cedar Street <br /> Everett, WA 98201 <br /> Dear Kirk: <br /> This letter is in response to your corrections regarding plan review for the above <br /> referenced Bartell Drugs store. The following are our responses to your correction <br /> comments. <br /> 1. Provide pedestrian audib/e warning device at Pharmacy drive-thru location. <br /> Information regarding the pedestrian audible warning device has been included in <br /> the project specifi;,ation manual and shown on the attached revised floor plan <br /> drawing A2.1. <br /> The following information was sent to us by Karl Lundberg at Barghausen Consulting <br /> Engineers in response to City comments: <br /> Sheet C1: We have changed the name of the reference to the City of Everett Public <br /> Works Department, as requested. <br /> $11€�t�2: Storm drainage from the building has been redirected to go to the catch <br /> basin at the northeast corner of the intersection of Broadway and 19th Street. <br /> Therefore, the existing combined storm sewer stub north of the intersection will not be <br /> used by the new building for roof drainage andler sewer service. We have removed all <br /> applicable notes regarding the use of the existing combined sewer/storm drain stub. <br /> Gas iraps have been called out on the new catch basins, as requested. <br /> Approximately 2,000 square feet of paved area, representing the drive-through portion <br /> north oi the building, is still directed to go to new Catch Basin No. 2, which is located on <br /> the existing 8-inch combined storm drain/sanitary sewer in the alley east of the building. <br /> Because all roof drainage is being directed to the system in Broadway, there is actually a <br /> reduction in drainage area going to the combined system in the alley. Directing this <br /> minimal amount of drainage to the alley system avoids the contractor having to make a <br /> deep cut into a minimum of three lanes of Broadway. <br /> Sheet�3: As previously mentioned,we have eliminated the connection to the existing <br /> side sewer north of the intersec;ion. We have labeled the connections to the water main <br /> to be installed by the City of Everett Water Department at the developer's expense, as <br /> requested. Also, we have called out a 1-inch water meter rather than a 1 1/2-inch, as <br /> I Ilh 1V.MARMC�9CW DRIVF SfCOYD f!<ioR •[V[REfT.WA 9B20i-2098 • PHONE A25-259-3161 FAX 425-949-7554 E-MAIL o11lceOdykemon.nat <br />