Laserfiche WebLink
page 2 of 2 � <br /> requested, because the Water Department does not have a 1 1/2-inch meter. The <br /> location of the existing water main is shown on the plans according to the as-builts <br /> supplied by the City of Everett. <br /> �L�4: Sediment bags have been called out, as requested, for the existing catch <br /> basins in the roadway. The existing power pole east oi the building has been relabeled <br /> to remain. <br /> $h�L�,F' : Appropriate details have been eliminated from the detail sheet. <br /> Should you require any further information please feel free to contact our office. <br /> Sincerel <br /> . a ary, AI <br /> Fib:0 c1121.doc RwN:it <br />� <br />