Laserfiche WebLink
� � i <br /> 8. Fire Suppression (Sprinkler) Svstem - An approved automatic suppression system <br /> shall be provided as required by City Ordinance No. 1902-�J2, Chapter 16.76, of <br /> the Evereri Municipal Code. <br /> Plans for any sucti system shall be submitted to the Buil�ing Department and the <br /> Everett Fire Depzrtment for examination and approval. Such plans �hall include <br /> plans for the underground mains that will supply the sprinkler system. <br /> Aboveground sprinkler piping shali be hydrostatically tested as established in <br /> NFPA Standard 13. Underground pipina shall be hydrostaticaily tested and <br /> flushed as established in NFPA Standard 24 for private fire mains. Aii such tests <br /> shali be witnessed by a Fire Department inspector. Call (425) 257-8123 to make <br /> an appointment for inspection. <br /> Contractors' materiais and test certificates shall be submitted to the Everett Fire <br /> Department prior to issuance of any Certificates of Occupancy. <br /> Call (425) 257-8123 for more information. <br /> 9. Hiqh-Piled Storaqe - Buildings containing high-piled combustible storage shall be <br /> in accordance with Article 81 of the 1997 Uniform Fire Code and Articles 81-1 and <br /> 81-2 of the 1997 Uniform Fire Code Standards. A Fire Department permit is <br /> required for high-piled storage over 500 square feet. <br /> 10. Trash Coilection - Dumpsters over 1.5 cubic yards capacity shall be located a <br /> minimum of 5 feet from the building [UFC 1103.2.2, 1997 Edition]. <br /> GENERAL INFORMATION <br /> 1. Puget Sound Energy is the naturai gas provider in this area. To initiate new <br /> service orders, please contact Marilyn Davis Westlund at (425) 356-7512 at least <br /> 90 days prior to the required in-service date. <br /> Any relocation of existing gas facilities for this development will be at the <br /> developer's sole expense, and reauires 90 days minimum notice. Piease contact <br /> Elaine Babby at (206) 224-2018 to coordinate relocation requests. <br /> 2. The Snohomish County PUD currently has sufficient capacity to serve the <br /> proposed development. For further information about the electrical service <br /> requirements for this project, please call Kurt Martin of the DistricYs Customer <br /> Engineering Office, Everett at (425) 258-8291. <br /> 3. Verizon Northwest has facilities near this location. However, any buiiding <br /> entrances must be coordinated at least 60 days in advance. The cost of any <br /> � <br />