My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2205 BROADWAY 2016-01-01 MF Import
>
Address Records
>
BROADWAY
>
2205
>
2205 BROADWAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2017 12:53:35 AM
Creation date
1/24/2017 12:52:14 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
2205
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. . ( r <br /> relocation of Verizon facilities that is required to construct the new apartments wiil <br /> be at the tota4 expense of the developer. Any relocation will take 60 to 120 days. <br /> Please contact Mike Hupf, Engineer at (425) 356-4052 or Mike Bly, Engineer at <br /> (425) 356-4034 if you have any q��estions regarding this building entrance. <br /> 4. Verizon Northwest will provide service to the site. Hnwever, new telephone cable <br /> construction wiil �e required in conjunction with the site development. Verizon's <br /> engineering wi;i begin when they are notified of your construction schedules and <br /> telephone requirements. <br /> 5. It will be the developer's responsibility to provide a suitable combination of conduit <br /> and trenchiny and/or riser conduit to accommodate Verizon's network <br /> communications cable within the complex. Provided that an acceptable <br /> combination of conduit and/or trenching is incorporated into the project to <br /> accommodate Verizon's entrance cable, there will be no costs to the developer for <br /> Verizon's cable. <br /> 6. If a rearrangement of existing cables on premises or on the right-of-w�y is <br /> necessary, appropriate charges will be estimated and Verizon's Guaranty of <br /> Payment form wili be fonvarded to you for your signature. Prior to commencement <br /> of Verizon's engineering for such rearrangement, a deposit will be required. To <br /> insure timely telephone service, Verizon reyuests ninety (90j days lead time for <br /> engineering, procurement, and installation of cable and/or Verizon's equipment. <br /> Please contact Michael Hupf, Engineer, at (425) 356-4052 or Mike Biy, Engineer at <br /> (925) 356-4034 should you require additional information. <br /> sepa02-052finalmdns <br /> O <br />
The URL can be used to link to this page
Your browser does not support the video tag.