My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2631 BROADWAY 2016-01-01 MF Import
>
Address Records
>
BROADWAY
>
2631
>
2631 BROADWAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2017 2:35:55 AM
Creation date
1/24/2017 2:35:27 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
2631
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Non-irrigated Plant Material <br /> No��ember 1 to T9arch 1. <br /> Plant material shall be installed per the details in the Plans. <br /> 5-02.3 (10) Fcrtilvcrs <br /> Section 8-02.3(10) is supplemented ��•ith the follo�ving: <br /> Tlie Contractor shall provide and apply plant fertilizer for plants at the time of initial <br /> planting. 77ie contractor shall mlain empty feriilizer containers for review� by the <br /> O��ncrs Representati�•e. Tlie Contractor shall apply fertilizcr per the manufacturer's <br /> instructions throughout area to be planted. <br /> Planl Periilizcr Tablets: The Contraclor shall evcnly distribute within the planting pits 2 <br /> plant fertilizer tablets per shrub. <br /> 8-02.3(11) 13ark or�1'ood Chip 1�1u1ch <br /> Section 8-02.3(1) is supplemented with the following: <br /> Delete the first sentence and replace with the following: <br /> �4'ood chip tnulch sUall be applied to a 3"depth in all planted arcas. <br /> 8-02.3 (13) 1'lant Establishmcnt <br /> Section 8-02.3(13) is supplcmented �vith thc fbllowin�: <br /> Thc plant establishmcnt duration for this project shall be for a period of thrce ycars. Thc <br /> plant cstablishmcnt plan shall show the schcduling. frequency, dates, materials and <br /> cquipmcnt utilizcd, �ti•hiche��er ma�� appl�t for all plant establishment actieities including. <br /> Uut not limited to, thc follo��•ing: <br /> A. Plant �stablishment Activities <br /> ]. \Veed Control: Remove ���eeds and im�asi�•c plant materizls not installed ��ith <br /> tl�is N'ork bi-�veekly from April 1 to Ociober 1 and monthly during othcr <br /> months. <br /> _ 2. Fertilizing:Appl�� feriilizer to the landscape area per manufacturcrs instructions <br /> oncc annually in April. <br /> 3. N'atcring <br /> 4. Litter and Debris Rcmoval: IZemocc litter from the site monthly and remo��e any <br /> litter or landscape debris from hardscape surfaces���itli cach ��isit. Kake and <br /> remo�•e leaves once annually in Noaember. <br /> 5. Pruning: Once animally prune as required to remo��e damagcd plant malerials <br /> throughout the year. <br /> G. Insect and Disease Controf <br /> 7. Grosion Control nlcthods and Proccdures: I'rompily notify O���icr's <br /> Rcpresentati�c of any �isiblc sicns of crosion or sctticmcnt, and cottecti��c <br />
The URL can be used to link to this page
Your browser does not support the video tag.