My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2631 BROADWAY 2016-01-01 MF Import
>
Address Records
>
BROADWAY
>
2631
>
2631 BROADWAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2017 2:35:55 AM
Creation date
1/24/2017 2:35:27 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
2631
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
action bcinc takcn. <br /> 8. Plant caze: Adjust plant material that l�as setticd or is leaning. Rcmo�'e and <br /> replace diseased, dying, dead, or missing plant materials during the plant <br /> establishment period. 71ie \'�'ork does not includc �•eliicular damage caused by <br /> others than the Conuactor. <br /> B. Other items as deterrnined Uy the Contractor <br /> C. Supervisor/Responsible Contact Name <br /> 1. Local address <br /> 2. Local telephone number <br /> D. Sign and datc thc Plant �stahlishmcnt Plan <br /> Pailure to comply ��'itli the plant cstablishmcnt plan or to re��ise ihc plan as outlined bg <br /> the O��mer's Representative���ill increase the duration of the plant establishment period. <br /> Pailure to comply���ith corrective steps as outlined by the O��rocrs Representati�•e will <br /> result in a suspension of time for the tivee }�ear plant establishment period. <br /> Any such suspension of time will not be lified until all unsatisfactoq'conditions havc <br /> been cottected to the satisfaction of the O�+roers Representative. Any suspensions for <br /> noncompliancc will increasc the duration of the thrcc �'ear plant establishment period. <br /> 8-02.3(14) Plant Rcplacement <br /> Section 8-023(14) is supplementcd ���ith thc following: <br /> Delete the first sentence and replace ���ilh the follo��-ine: <br /> The Contractor shull be responsiblc for gro���iug or pro�iding cnough plants for <br /> rcplacement of all plant material rejected through the tUree ycar plant establishment <br /> period. <br /> 8-02.� Mcasuremcnt <br /> Scction 8-02.4 is supplcmcntcd �cith the folla��ing: <br /> Landscapc 13oulders will be measurcd per ton. <br /> Landscape Curb ���ill be mcasured per lincar foot. <br /> \'�'eed Barrier Pabric���ill Ue mcasurcd per square �ard. <br /> 8-112.5 I'a��ment <br /> Section 8-02.5 is supplemented with the follo��•ing: <br /> "\Veed Barrier Pabric', per square ��azd. <br /> "Landscape Bouldcrs", per ton. <br /> "Landscape Curb", per lincar foat. <br /> The unit contract prices for all \'Vork scope shall be full compensation for all labor, <br /> malcrials,tools,and equipiuent required to provide the items as slio��n in tlie Plans and in <br /> thcsc Special Provisions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.