Laserfiche WebLink
� 4.1 Treatment Control System <br /> Water qualiry treatment is not required by the City of Everett. Treatrnent from proposed <br /> pollution-generating impervious and pervious surfaces will occur at the sewage treatment plant, <br /> To improve the hydrologic rnnditions of the site, including reducing peak Flow rates, increasing <br /> evapotranspiration, and providing treatment of pollutants, a portion of the stormwater runoff <br /> from impervious surFaces will be routed to bio-retention facilities(rain gardens), which will use <br /> compost amended soils to provide treatment and stormwater runoff retention. These facilities <br /> are located along the project site frontage. <br /> 4.2 Flow Control System <br /> Detention pipe is proposed in two separate locations at the projed site. Western Washington <br /> Hydraulic Modei v.3 (WWHM3) is a conti�uous simulation model which was used to size the <br /> detention facilities for each location. As both locations are tributary to[he same combined sewer <br /> main, and are both part of the same development project, the system was modeled wi[h a single <br /> point of compliance. When analyzing botti systems together, the deveioped peak Flow retes are <br /> identified as lower[han the pre-developerJ; additionaliy the duration requirement is met from 50 <br /> percent of the 2-year recurrence intervaf up to the 100-year, which exceeds the City of Everett <br /> requirement. <br /> Calcutations for the detention pipe can be found in Appendix 8, Exhibit B-1. <br /> Table 1: Detention Pipe Summary <br /> i Basin i DetenHon Pipe i Required Length of Pipe <br /> Basin 1 I 6.0•foot diame[er � 350 linear feet <br /> Basin 2 � 6.0-foot diameter ', 450 linear feet <br /> i <br /> 4.3 Conveyance System Analysis and Design <br /> 4.3,1 Onsite Conveyance System <br /> The Ciry of Everett requires that all storm and sewer utility tines are separated onsite. ThereFore, <br /> the project site conveyance system consistr of 6-inch, 8•inch, and 12-inch diameter closed <br /> drainage pipe systems, which conned to a 30-inch sewer pipe in the Memorial Stadium parking � <br /> lot. See Appendix A, Exhibit A-4 for the projed site Conveyance Pipe Map. ' <br /> The pipe system was checked for capacity and minimum velocity for the 25-year, 24•hour storm. <br /> The Rational Method was used in accordance with the City of Everelt Sformwater Managemen[ <br /> Manual. For locations downstream of the detention facilities, the 25-year mitigated and the 100- <br /> year unmitigated peak Flow rates were checked for pipe capacity. Conveyance calculations can <br /> he found in Appendix B, Exhibit B-2. <br /> 4.3.2 Offsite Conveyance System <br /> The City of Everett has reviewed and accepted preliminary Aow control caiculations for the <br /> proposed project, which demonstrate that the project wili not increase peak flow rates for the <br /> Stormwater Site Plan Report O Q O Q <br /> Eve,ett School Dishict . <br /> Communiry Resource Center 4 <br /> 208387.10 <br />