My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3900 BROADWAY BASE FILE 2016-01-01 MF Import
>
Address Records
>
BROADWAY
>
3900
>
BASE FILE
>
3900 BROADWAY BASE FILE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 11:44:55 AM
Creation date
1/24/2017 8:38:49 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3900
Tenant Name
BASE FILE
Notes
GEOTECHNICAL REPORT INCLUDED (RESOURCE CENTER JACKET 3* REMOVED BECAUSE WAS EXACT DUPLICATE OF GEOTECHNICAL REPORT)
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
658
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i SPCC Program Managemeet <br /> All Contractor empioyees will be trained in these spill contro! and response procedures, including <br /> spill source and receptor recognition, spill prevention techniques, spill response measures, and <br /> spill repoRing protaol. <br /> Should site conditions change, this SPCC will be updated as necessary. <br /> 6.O SPECIAL REPORTS AND STUDIES <br /> "Subsurface Exploration, Geologic Hazards and Final Geotechnical Engineering Report" by <br /> Associated Earth Sciences, Inc., dated February 2, 2012, is provided in Appendix C of this report. <br /> 7.0 OTMER PERMITS <br /> A National Pollution Discharge Elimination System (NPDES) Stormwater permit from the DOE is <br /> necessary because the proposed improvements will disturb more than 1 acre. <br /> $.O MISCEILANEOUS FORMS AND WORKSHEETS <br /> The City of Everett Cost Estimate for Permit Fee Calculation will be provided to the City, if <br /> necessary, for the Ciry's use to determine permit Fees and bond amoun[s. <br /> 9.O MAINTENANCEAND OPERATIONS REQUIREMENTS <br /> � This section includes a list of specific permanent and construction EMPs and instructions for their <br /> maintenance. Maintenance guideiines for erosion control facili[ies should be onsite at all times <br /> during construction, and the checklists for permanent stormwater Facilities shall be kept by [hose <br /> responsible for the maintenance of[hese facilities. ti checklist shall be prepared and submitted <br /> to the City oF Everett per[he following schedule: . <br /> • Monthly from November through April <br /> • Once in late summer(September) <br /> • After ar.y major storm event <br /> The items for maintenance consideretion are as foilows: <br /> Temoorarv Construction Erosion/Sedimentation Control BMPs <br /> 1, Fi�ter Fabric Fence <br /> 2. Temporery Construction Entrance <br /> 3. Construction Fencing <br /> 4. Temporary Sediment Trep <br /> 5. Catch 8asin inlet Protedion <br /> 6. Cover Measures <br /> Stormwater SiG�Plan R?port OQOO <br /> Everett School DisGict . <br /> ComrnunRy Resou¢e Center 8 <br /> 208387.10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.