Laserfiche WebLink
� 3. Containment and Elimination of Source: Contain the spill with absorbent materials, Floating <br /> booms, or a soil berm around the affected area. Eliminate the source of the spill by closing <br /> vaives, sealing leaks, providing containment, or deactivatir�g pumps. <br /> 4. Cieanuo: When containment is complete, use absorbent and other materials to clean up <br /> the spill. <br /> 5. Notification: Report all spills immediately. All notification will proceed according to [he <br /> following protocols� <br /> If necessary,the Contrador's ESC/Stormwater lead (or any employee if the <br /> ESC/Stormwater Lead is unavailable) should conWct emergency agencies <br /> and/or spili response services: <br /> Emergency Services: Fire Department: 911 <br /> (fre and medical) <br /> Spill Response Contractor: Contractor to provide: <br /> (name and phone) <br /> All Contrector em lo ees will noti the Contractor's desi nated <br /> P Y �Y 9 <br /> ESC/Stormwater Lead: <br /> � Contractor's ESC Lead: Contractor to provide: <br /> The Contractor's ESC/Stormwater Lead will notify the City of Everett: <br /> For all spills that produce a National Response Center Hotline: <br /> surface sheen: (800) 42q•8802 <br /> Washington Department of Ecology: <br /> (425) 649•7276 <br /> Any release that may be a threat Ecoiogy Toxics Cleanup Program: <br /> to human health or the (36G) 407•7170 <br /> environment: <br /> Any spill to water that cannot be Washington State Emergency <br /> contained: Management Division: (800) 256-5990 <br /> 6. Removal and Disoosal of Contaminated Materials: Remove all contaminated soii and place <br /> on a plastic liner, cover with plastic, and remove offsite within 24 hours. Properly dispose <br /> of contaminated soil at an approved disposal facility. Collect absorbent and other materials <br /> into a labeled container and properly dispose of at an approved disposal faciliry. <br /> 7. Follow•Uo Reoortin : Fill out a Spill Report Form (located in Appendix A, Exhibit A-6) <br /> within 2 working days and submit it to Contrador's ESC Lead. <br /> Stormwater Site Plan RepoK 0 Q O Q <br /> Everett School Di;trict . <br /> Commumry Resource Center 7 <br /> 208387.10 <br />