My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5410 BROADWAY 2016-01-01 MF Import
>
Address Records
>
BROADWAY
>
5410
>
5410 BROADWAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2017 8:58:28 AM
Creation date
1/24/2017 8:58:12 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
5410
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c <br /> � � � <br /> foundation walls that retain earth and enclose interior spaces and floor below grade <br /> shall be waterproofed from the top of the foodng to the finished grade. <br /> 7. Provide sections and/or details showing energy code compliance per 2009 Washington <br /> State Energy Code (WSEC) including: <br /> a. Window and door u-valve <br /> b. R-49 ceiling insulation (includes scissor trusses) <br /> c. R-21 insulation in wood framed walis above grade <br /> d. R-21 insulation on the interior of below grade walls <br /> e. R-10 rigid insulation with thermal break where slab-on-grade is within 24"of the <br /> finished grade. <br /> f. R-10 rigid insulation with thermal break at the perimeter of the slab-on-grade <br /> adjacentto the S.O.G. in garage. <br /> g. R-30 insulation in the floor abovr unconditioned spaces. <br /> 8. Specify all components of front porch. Include specifications for guard at porch, guard <br /> at stairs, stair stringer(size and spacing), tread material, decking and handraii. <br /> 9. Specify joint hangers at G.L.B. at garage. <br /> 10. Specify post supporting G.L.B. at garage. Detail beam pocket in concrete (if applicable). <br /> 11.Show proposed building height on elevation view. Refer to height calculations on site <br /> plan. <br /> 12. Provide (2) 6"x12"screened openings located (1) high and (1) low near the water <br /> heater for combustion air. Show requirement on plans. <br /> 13. Outdoor lighting and a minimum of 50% of indoor luminaires shall be high efficacy <br /> luminaires. Show required on plans. <br /> Ptease prepare a response letter showing where each item in this oorrection letter is <br /> addressed on the plan seG <br /> Upon resubmittal of the drawings, your application will be given priority and plan review will <br /> recommence. <br /> All required submittals shall be of sufficient detail and contain sufficient information to ensure <br /> that the proposed structure will be constructed in compliance with all adopted codes. <br /> Sincerely, <br /> ��r�.� <br /> ]eff Heilman <br /> �—Development TeEhnician <br /> 425-257-8976 <br /> Email: �eilman@ci.everett.wa.us <br /> �� <br /> M�r........,...�n.a..n�u,.n.....a r��na M�iu�n o�.,�....n a..... <br />
The URL can be used to link to this page
Your browser does not support the video tag.