Laserfiche WebLink
the gcvyid, as mcasumd from thc back of the wall block, will bc 14 fcct long for thc maximum <br /> cxposed wall height of I G fceL Qf conditions or grading changes rcquirc wall hcights grcatcr <br /> than 16 fcxt, thc wall design enginccr, I3GC, pllc should be contacted to provide a dcsign <br /> rcvision.) As thc wcst wail steps up the slopc Gom the low at lhc northeast corner, the grid <br /> Icngths may bc shortened to 80 perccnt of thc wall hcight as the wall hcight decreases. 7�he <br /> geogrids must be placed horizontally and at thc proper intcrvals as spccificd on ihe wall secuon <br /> dctail. The maximum vertical spacing bctwcen laycrs of geogrid reinforccmcn[shall bc 24 <br /> inchcs. Thc minimum 24 inches of cmbcdment material in front of lhc wall :nust bc excavatcd <br /> dow�n into nativc sedimcnts and thc excavation shall be cut as close to the facc of the wall as <br /> possiblc such that minimal space betwecn the H�al) batc and the cmbedment soil occurs. <br /> T7�c manufacturcr's rccommendations for placing and asscmbling wall blocks should bc <br /> followccl at all timcs. Thc procc:ss of placing rows of walls blocks, placing drain rock, <br /> backGlling and compacting thc fill, and placing laycrs of�cogrid reinforccmcnt will bc repeatcd <br /> until achieving the planned wall hcight. Pach layer of geogrid should be tcmporarily stakcd to a <br /> taut condition prior to placing soil backfill on top of it. Kccping the gcogrid taut will reduce the <br /> potential for post construction wall movemcnt. <br /> The gcogrid chosen for the w:ill analysis was Stratagrid 500 a�d Keystone wall blocks. Other <br /> gcogrid and block manufacturers are acccptablc; I3GC, pllc should bc conlactcd to approve an <br /> cyuivalent strength gcogrid from thc choscn brand and vcrify acceptabi!ity with thc prescntcd <br /> wall design. <br /> The approximatc 12 inch zonc immcdiatcly bchind thc wall blocks will consist of drsin rock. <br /> 'i'his drain rock shall be cican, frec-ciraining,crushed rock with a maximum diametcr of 1'/. <br /> inches. 1'rec-drainin6 is definecl a�s less than 5 perceot passing the No. 200 sicve when mensurcd <br /> on the minus N4 Gaction of the total. Pca�-avel or round, washcd drain rock may not bc used in <br /> this wall drain zonc. A 4 inch diametcr perforateJ clrain pipc should bc embeddcd at tre base of <br /> diis drainagc column of rock Thc pipc dischargc should bc out thc face or around thc cnd of thc <br /> �r.ill at Ihe low point (or poinLS) of thc foundation cxcavation. The discharge should thcn be <br /> tightlined to Uic toc of the slope. If onsitc wils arc used for swctw3l fill within thc wall <br /> back(ill zone, it will be n��cessary to cstablish a sccondary"chimney drain" behind thc <br /> minforccd fill. if a cican, fre;c-cir.uning, imported s.v�d and gravcl is uscd to construct Uie <br /> minforced wall fill the chimney drain will not be necessary. The need for a secondary drnin will <br /> bc dctemiincd at Uic timc of construction bascd o� the pc�entage of fines in lhe wall backfill � <br /> soil bcing uscd. <br /> 'llic constrvction of thc wall should bc completed Uy a contractor with expericncc in <br /> conswction of sc�nenlal block w�ill systerns. The sWctival intcgrity dcpcnds on proper <br /> placcment of wall system com�wnenLs mid compaction of Ihe wall backfill. A rcpresentative of <br /> this firm should provide ovcrsight during construction to verify compliancc with Uie dcsign <br /> detail :uid for yuality control purposes. It will also be neccs�ry to have a testing labontory <br /> provide in-situ density tcsts to vcrify the structutal compaction of thc backtll. <br /> It should also be understood uiat all se�nenta! block walls move some small amount laterally <br /> atter conshuction. This movcment is neccssary to achicve the passive carth pressurc bctwea;n <br /> the struclural fill soil and thc gcogrid reinforcement. iateral wall movemcnt of about 1 perccnt <br /> of thc wall hcight may occur, tyQically during thc first ycar aftcr complction of thc wall. <br /> (3GC, pllc 142G7 209w Avenuc NG, Woodinvillc, WA 98077 (425) 273-5062 <br />