Laserfiche WebLink
filling progresses up the side slopes,the new fill should be notched into the side slopes to <br /> structurally tie the new fill into the medium dense native sediments. <br /> The new fill slopes should be limited to a maximum slope inclination of 2H:1 V. Vegetation <br /> should be established as soon after fill as possible. It may be necessary to temporarily cover the <br /> fill slopes with plastic sheeting to provide erosion protection during construction until the <br /> vegetation process can occur. <br /> We trust that this information will aid with the successful development of your property. If there <br /> are questions,please contact us. <br /> Sincerely, <br /> Battermann Geotechnical Consulting,pile <br /> ix-r4,7, <br /> r <br /> :4, 9627 c, x ,'( <br /> EXPIRES 11-28-i fp <br /> Jamey S. Battermann, PE,LG <br />