Laserfiche WebLink
32. Any rockeries or retaining �valls proposed in required setback areas must be in conformance with <br />Section 39.150 of the Zoning Code. <br />33. Rooftop mechanical equipment, including vents, must be screened per Section 39.040 of the Zoning <br />Code. <br />34. Building setbacks must be a minimum of 0 feet front yard (west property line), 5 feet side yard (north <br />and south property lines) and 10 feet rear yarci (east property line). Building height shall be a <br />maximum of 50 feet. <br />35. Landscaping must be provided per Section 35 of the Zoning Code. At a minimum this must include <br />the fo�lowing: <br />a. A landscape strip a minimum of 10 feet wide must be provided in the front yard setback area <br />along the Broadway frontage, except for the driveway. This area shail be planted wilh Type <br />III landscaping. All public right of way beh�nd the sidewalk or edge of pavement shall also be <br />landscaped to Type III standards, which shall include at a minimum lawn or sod. <br />b. A landscape strip a minimum of 5 feet wide must be provided along the norlh and south <br />property lines. This area shall be planted with Type III landscaping. <br />c. A landscape strip a minimum of 10 feet wide must be provided along the east property line <br />where the property abuts I-5. This area shail be planted with Type II landscaping. <br />d. A minimum of 228 square feet of landscaping shall be provided in the interior of the parking <br />lot for the 13 surface parking stalls. Landscape areas must be planted and located per <br />Section 35.080E of ihe Zoning Code. No required landscape area shall be less than 64 <br />square feet in area or five feet in width. Internal landscaping is not required for the portion of <br />parking located within the enclosed garage. <br />The landscaping plan must show planting locations, type and sizes also the plan must show <br />the location and dimensions o( required vegetated swales, wetponds, detention ponds, <br />rockeries and retaining walis, and grading at 2 foot intervals. Irrigation syslems must be <br />provided in all landscaped areas per Section 35.130 of the Zoning Ccde. A 2-year <br />maintenance assurance device must be provided for the landscaping per Section 35.130B of <br />the Zoning Code. <br />36. The Washington State Clean Air Act requires the use of all known, availabfe, and reasonable means <br />of controlling air pollution, including dust. Dust generated during construction activities can be <br />controlled by �•+etting those dust sources such as areas of exposed soiis, washing truck wheels <br />before they leave the site, and installing and maintaining gravel construction entrances. <br />Constn�ction vehicle track-out is also a major dust source. Any evidence of track-out can trigger <br />violations and fines from the Department of Ecology or the Puget Sound Air Pollution Control <br />Agency. <br />GENERAL INFORMATION <br />The Snohomish County PUD currently has sufficient capacity to serve the proposed development. <br />For further information about the electrical service requirements for this project, piease call the <br />District's Everett Office at 258-8291 to contact a Customer Engineer. <br />/(Q <br />