Laserfiche WebLink
c. <br />FINAL MITIGATED <br />DETERMINATION OF �ION-SIGNIFICANCE <br />SEPA #01-048 Mun�ay O�ce Building <br />September 20, 2001 <br />Description of Proposal: Construction of a 2-story 10, 294 square foot office building with associated <br />parking. <br />Applicant: <br />Representative: <br />Locatlon: <br />Zoning: <br />Ge�erei Plan: <br />Lead Agency: <br />Contact Perso�: <br />Mitigation Measures: <br />Bill Murray <br />8229 44th Ave., W <br />Mukilteo, WA 98275 <br />James Thomas <br />2221 Everett P.ve., #i201 <br />Everett, WA 98201 <br />8115 BROADWAY <br />C-1_ General Commercial <br />4.2_ Community Business <br />Ciry of Everett Planning Department <br />Becky Fauver Phone: (425) 257-8731 <br />The environmental impacts of this proposal are documented in the Environmental Checklist and other <br />information on file with the City. The listed requirements are placed in response to our review of this <br />information: <br />AGENCIES WITH JURISDICTION <br />Department of TranspoRation <br />MITIGATION OF ADVERSE IMPACTS BY SEPA <br />Any gradinglfill on this site shall be done so as to not impact the surrounding properties. (SEPA <br />Earth, Land and Shoreline Use Policies.) <br />2. In order to minimize erosion, any spoil piles must be covered with plastic sheeting or other <br />impervious covering staked to the ground or anchored with rocks or sandbags. Berms, earthen or <br />otherwise, should be constructed at the perimeter of excavated areas to prevent adjacent site runoff <br />from entering the excavations. (SEPA Earth and Water Policies) <br />� 2930 Wetmore, Suite 8-A, Lverett, WA 98201-4044 �(425) 257-8731, Pax (425) 257-8742 <br />�` <br />