My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
810 N BROADWAY 2016-01-01 MF Import
>
Address Records
>
N BROADWAY
>
810
>
810 N BROADWAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 8:50:48 PM
Creation date
1/24/2017 12:27:03 PM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
810
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OP NON-SIG2iIPICANCS <br />� �C���dC�D <br />� V 1 989 <br />NO 31 <br />... .............. _ <br />SEPA i139-69: Bolando Morales titni-Storage Paci.l�,t�yY v, :VcF: i f <br />ruVI1C Yrliik> ..��,t. <br />DESCRIPTION OF PROPOSAL: The requeated action ia for the isauance uf Building <br />and Public Works permits for r.he conatructiou of a <br />9,922 square foot mini-storage facility with 242 <br />square feet of office space on a 40,000 squarc foot <br />sice. Four (4) on-aite parking atalls are propoaed. <br />PROPONENT: Brian Hayes <br />Cobra Conetruction Company for Rolando Moralea <br />P.O. Box 1299 <br />Everett, WA 98206 <br />Phone: 258-3667 <br />LOCATION: <br />LEAD AGENCY: <br />Contact Person: <br />MITICATION MEASURES: <br />Southwest corner of Broadway Avenue and Legion <br />Drive, Everett <br />City of Everett Planning and Community Developme¢t <br />Pepsrtment <br />Juatin C. Osemene Phone: 259-8731 <br />The environmental impacta of this propoeal are documented in the Environmental <br />Checklist and other information on file wi[h khe City. The listed <br />requirements are placed in response to our review of this information: <br />AGINCIES WITH JURISDICTION: None <br />MITIGATION OF ADVERSE IMPACTS BY SEPA <br />1. Any grading/fill on thia s±te shall be done so ae to not impact the <br />aurrounding properties. (SEPA Farth, Land and Shoreline Use Policiea) <br />2. Screening of all outdoor refuae diaposal areas muet be provided so that <br />they are not visible from public righta-of-way. The diaposal areae <br />must be ahown on the site plan submitted for building permlts. (SEPA <br />Aeethetice Policies) <br />3. The Waehington State Clean Air Act requirea the use of all known, <br />available, and reasonable meana ef controlling air �..:1lutioa, ircluding <br />duat. Dust generated during construction activities can be controll.�d <br />by wetting thoae duat sourcea such ae areae of expoaed soils, waehing <br />t:ruck wtieels before tney leave the site, and installing and m3intaining <br />gravel construction entrancea. Construction vehicle track-out is also <br />a major dcat source. Any evidence of track-out can trSgger vlolatione <br />and fines from r.he Department of Ecology or r.he Puget Sound Air <br />Pollution Control Agency. (SEPA Natural Environment/�ir Quallty <br />P�licies) <br />
The URL can be used to link to this page
Your browser does not support the video tag.