Laserfiche WebLink
Pagc 2 of 4 <br />Please see the attached proposed GA design for the horizontal assembly portion of the 1 hr. assembly for the Large Conference <br />Room. I have discussed this wiih the contractor, so this is they assembly he would like to plan for Hope this is O.K. <br />Thanks. <br />Devin <br />From: Meg Haley [mailto:MHaley@ci.everett.wa.us] <br />Sent: Thursday, July 27, 2006 1:49 PM <br />To: Devin Saylor <br />Cc: Tony Lee <br />Sutrject: RE: Providence Everett Medical Center B0607-003 <br />Devin, <br />Sure, that will werk. The building permit stamp will exclude the approval of MEP drawings, so they really don't need to be <br />included in the set at this time. Just give me a call when you have dropped off the drawings at the counter (Ieave a messaae ii 1 <br />am out of the office), and I will expedite the processing on my end. <br />Thanks, <br />Meg <br />Plans Examiner, City of Everelt <br />425-257-8813 <br />925-257-8856 /ax <br />From: Devin Saylor [mailto:devin@bnharch.com] <br />Sent: Thursday, July 27, 2006 1:34 PM <br />To: Meg Haley <br />Subject: RE: Providence Everett Medical Center B0607-003 <br />Hi Meg, <br />I have a question regarding what would be acceptable for resubmittal in regards to the questioned future hallway. The hospital <br />has decided that they would like to include a portion of the exit hallway in the permit now. The extent would be the option I <br />described to you yesterday. With the build out of the hallway the future exit door would be cut in, a new ceiling would be installed, <br />new lighting would be installed w/emergency egress lighting and exit signage and HVAC would be ducted in. <br />In the essence oi time, short of going back and having all of the mechanical and electrical drawings redone, would it be <br />acceptable to show, on the overall building plan, the hallway walls and exit doors and then add a sort of contractor bidder <br />designed note indicating that they are ro install a new ceiling, lighting w/emergency egress lighting, exit signage and HVAC? <br />Just let me know. <br />Thanks. <br />Devin <br />From: Meg Haley [mailto:MHaley@ci.everett.wa.usJ <br />Sent: Wednesday, July 26, 2006 3:29 PM <br />To: Meg Haley; Devin Saylor <br />Cr. Tony Lee <br />Subject: RE: Providence Everett Medical Center 80607-003 <br />Devin, <br />This is to follow-up on our meeting loday to confirm information and discussions that we had. In addition ro the lwo lelters <br />attached, we discussed the following items: <br />1. Designating exits with temporary striping on the fleor is acceptabte (rated corndors not required for B or A sprinklered <br />3/4i2006 <br />