Laserfiche WebLink
�'ili � <br /> Discharge from the site is to an existing atorm drainege aystem in Cedy Road. The <br /> propus�detention system will detain all storm evcnts including the 100 year storm event. Since <br /> the proposed 100 year peak discherge from the site is only 5%of the the cepacity of the existing <br /> 8"pipe (see Malysis of RunoffControl section),and since the dawnstream pipes ere ell 12"or <br /> lerger, no adverse impact to the downstresm system ere expxted. <br /> 7 <br />