My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1014 CALIFORNIA ST 2016-01-01 MF Import
>
Address Records
>
CALIFORNIA ST
>
1014
>
1014 CALIFORNIA ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2017 7:09:27 PM
Creation date
1/24/2017 7:09:05 PM
Metadata
Fields
Template:
Address Document
Street Name
CALIFORNIA ST
Street Number
1014
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, • <br /> • DIVISION 2, SITE CONSTRUCTION <br /> SECTION 02060 <br /> BUILDING DEMOLITION <br /> PART 1 —GENERAL <br /> 1.01 SUMMARY <br /> A. Related Documents: The provisions and intent of the contract, including the General <br /> Conditfons, apply to this work as it specified in this section. <br /> 1.02 DESCRIPTION OF WORK I <br /> A. The extent and the location of the demolition work are indicated on the drawings. The <br /> work includes, but Is not Ifmited to, the satfsfactory removal, wholly and proper off-site <br /> disposal of the 2-story Glacier Cold Storage Buflding, contents of the building, <br /> excavation to expose walls, concrete docks, slabs-on-grade, concrete foundations, <br /> metal canopies attached to the building and freestanding, miscellaneous debris <br /> Including items stored along the eastem and southem walls of the building. <br /> B. The demolition work is included on the drawings for guidance only and to indicate <br /> rypical general consiructir.n features oi the various types of structures, and is not to be <br /> construed as definite or adequate to supplant the actual on site inspection by the <br /> Contractor. <br /> 1.03 J08 CONDITIONS <br /> A. The Contractor represenls tha! they have visited the site to become familfar with the <br /> quantity and character of all materials to be demolished. The Contractor agrees that the <br /> premises were made available prlor to the deadlfne for submission of tho bfds for <br /> whatever inspection and tests the Contractor deemed appropriate. The Contractor <br /> assumes full responsibility for the proper disposal of all demolished materials. <br /> 1.04 SUBMITTALS <br /> A. T"he Contractor shall submit to the Owner a demoHtion plan at least 14 days prior to the <br /> demolition of any structure that, at a minimum, shall address the following: <br /> 1. Worker safety. <br /> 2. Protection of the public. <br /> 3. Schedule of phased demolitfon and descriptions of all steps to be taken. <br /> 4. Methods of demolition and equipment proposed to demolish each item. <br /> April 27, 2001 02060- 1 <br /> . � <br />
The URL can be used to link to this page
Your browser does not support the video tag.