Laserfiche WebLink
DIVISION 2, SITE CONSTRUCTION <br /> SECTION 02468 <br /> SOLDIER PILES <br /> PART 1 -GENERAL <br /> 1.01 RELATED WORK SPECIFIED ELSEWHERE <br /> A. The provisions and intent of the contract, (ncluding the General Conditfona, apply to this <br /> work as if specified in this section. Work related to thfs section is described in, but not <br /> limited to: <br /> 1. Sectfon 02300 - Earthwork <br /> 2. Section 03300 -Cast-in-Place Concrete <br /> 3. Section 09800 -Pafnting <br /> 1.02 DESCRIPTION OF WORK <br /> A. The extent and lacation of the "Soldier Piles" work is indicated on the drawings. The <br /> work includes lhe requirementa (or fumishing and installing augered concrete pilea. It <br /> also includes reference standards and the applicable provisions of pertinent codes. <br /> Data characterizing the soil conditions fs presented in the Geotechnical Report, <br /> Proposed Snohomish County SheriN Building (Kleinfelder, January 29, 2001). This <br /> report is available from the Owner by request. <br /> B. Soils Investigation: The soils investfgation indicatea the location of soil borings. This <br /> fnformation on underlying earth strata is to be conoidered as indicatfve of aoil conditlons <br /> to be used by the Contractor at his discretion and is not guaranteed as factual. The <br /> Contractor shall acquaint himself with the subsurface conditions. <br /> 1.03 QUALITY ASSURANCE <br /> A. Inspectian and Testing <br /> 1. The Owner will re!ain the services of a recognized Soils Engineer to ensure pile <br /> placement adheres to the contract documenta. <br /> 2. The Soils Engineer will provide constructian obaervatfon and geotechnical <br /> engineo�ing services during the constructfon of soldier pile work. Soils <br /> engi�ieering sevices will include the following: <br /> a. ��bservatior� of augered material to verify tho nature of the soils and <br /> c'etermination thet pile bottoma are compatible with the specified pile capacity, <br /> as indicatF,d on the contract drawings, prior to concrete placement. <br /> April 27, 2001 02458- 1 <br /> � <br />