My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1014 CALIFORNIA ST 2016-01-01 MF Import
>
Address Records
>
CALIFORNIA ST
>
1014
>
1014 CALIFORNIA ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2017 7:09:27 PM
Creation date
1/24/2017 7:09:05 PM
Metadata
Fields
Template:
Address Document
Street Name
CALIFORNIA ST
Street Number
1014
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. Observe and approve the pile placement procedure, equfpment, end <br /> materials. In the case of a dispute, the Sofis Engineer's decision shall be <br /> final. <br /> c. Other geotechnical considerations which may erise during the course of <br /> construction. <br /> B. Contractor's Duties Relative to Inspection <br /> 1. Notify Owner 24 hours in advance of beginning instailation of each pile. <br /> 2. Records: Maintain a complete and accurate record of all auger-placed concrete <br /> piles. The record shall indicate the pile locatfon, dfameter, length, elevations of tip <br /> and top oi pile, and the volume and strength of mortar material uaed in each pile. <br /> The record shall also note unusual conditions encountered duhng pile installatfon. <br /> C. Pile Location Survey: The Contractor shall locate all pile centers in accordance with <br /> the drawings. <br /> D. Protection: Protect structures, underground utiliHes, and other conatruction from <br /> damage caused by piling operatfons. Damage shall be repaired at no cost to the <br /> County. <br /> E. The Contractor shall not drill piles with the drillfng equipment placed within 10 teet <br /> either sfde of the outside edge of the existing 48-inch diameter wsterline ahown on the <br /> drawings. <br /> 1.04 SUBMITTALS <br /> A. Records: Submit records described under Sectfon 1.03.8.2 in accordance with <br /> requirements of the General Conditions. <br /> B. Submit mix designs for ail grouts and concretes in accordance with the requirements oF <br /> the General Conditons. <br /> 1.05 PRODUCT HANDLING <br /> A. Protection: Protect materials before, during, and after InstallaHon. Protect installed <br /> work and materials of olher trades. <br /> 1 08 JOB CONDITIONS <br /> A. Existing Conditions: A geotechnical report has been made (refer to Section 1.02A). <br /> The Contractor shall be aware of the conditions that may be encountered and install <br /> piles into bearing strata to the depths shown or as directed by the Owner and <br /> authorized agents. <br /> B. Waste Material: Augered pile spoils ahall be disposed of in accordance with <br /> Section 02200, "Earthwork,"and the General Conditions. <br /> April 27, 2001 02458 -2 <br /> • O <br />
The URL can be used to link to this page
Your browser does not support the video tag.