My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1014 CALIFORNIA ST 2016-01-01 MF Import
>
Address Records
>
CALIFORNIA ST
>
1014
>
1014 CALIFORNIA ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2017 7:09:27 PM
Creation date
1/24/2017 7:09:05 PM
Metadata
Fields
Template:
Address Document
Street Name
CALIFORNIA ST
Street Number
1014
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 3, CONCRETE . <br /> SECTION 03200 <br /> CONCRETE REINFORCEMENT <br /> PART1 -GENERAI <br /> 1.01 RELATED WORK SPECIFIED ELSEWHERE <br /> A. The provisions and intent oi the contract, including the General Conditions, apply to this <br /> work as if spec�ed in this section. Work related to this section is described in: <br /> 1. Section 03300 - Cast-in-Place Concrete <br /> 1.02 DESCRIPTION OF WORK <br /> A. The work includes the requirements for manufacture, detailing, cutting, bending, <br /> transporting, and placing of all concrete reinforcement and associated items required or <br /> indicated on the drawings. <br /> 1.03 QUALITY ASSURANCE <br /> A. Qualifications of Workmen: Provide at least 1 person who shall be present at ell times <br /> during execution of this portfon of the work, and who shall be thoroughly familiar with <br /> the type of materials being installed and the best methods for their installation, and who <br /> shall direct ell work performed under lhis aection. <br /> B. Codes and Standarda: In addition to complying with all pertinent codea and <br /> regulations, comply with all pertinent recommendationa conteined in "Menual of <br /> Standard Practice tor Detailing Reiniorced Concrete Structures," publication ACI 315- <br /> 80 oi the American Concrete Institute. <br /> 1.04 SUBMITTALS <br /> A. Five days before any concrete reinforcement materials are delivered to the job aite, <br /> submit shop drawings to the Owner in accordance with the General Conditfons. <br /> B. Do not deliver concrete reinforcement to the job sfte until receipt of shop drewings <br /> approval from the Owner and authorized agenta. <br /> 1.05 PRODUCT HANDLING <br /> A. Protection <br /> 1, Protect reinforcement before, during and after instailation, and protect the instelled <br /> work and materials of other trades. <br /> April 27, 2001 03200- 1 <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.