Laserfiche WebLink
SNOBOMI6H COUNTY PUD �1 <br /> HEADQUART6RS SIPIINSION i RBNOVATION <br /> MEETINO OF 30/$1 �T TR11 <br /> October 26, 1992 <br /> Thoee Present• <br /> Rod Williame TRA 258-8241 <br /> John Haekell TRA 224-4712 <br /> Jeff 9orek TBC 547-0144 <br /> Don Hoopengarner TBC 547-0144 <br /> Pete LeClair HPCC 251-0221 <br /> Ernie Ward Vallley Elec 424-6602 <br /> Ed Edlin Martina 483-3220 <br /> Sam Preeton Everett F.D. 259-8726 <br /> Tim Tyler Everett Sldg. 259-8810 <br /> Chuck Hartung TRA 682-1133 <br /> Craig Thompeon PUD 258-8606 <br /> Terry Chrietian TRA 224-4724 <br /> Cindy Wilson TRA 224-4714 <br /> Clint Squire HPCC 388-0230 <br /> Pete Piza GSS 622-6545 <br /> Thie meeting was held to go over the Fan Control Panel and <br /> related iesues . It was �atermined that ecope iteme would be <br /> addressed at a future date. A guideline for the meeting wae a <br /> letter sent to the architect by Clint Squire which originated at <br /> Martina. (Since items 1, 2, 3, 5 were ecope releted, they were <br /> not addreseed) . <br /> Item 4: Would the FCP remain ae drewn on diagram 93. 41 or would <br /> it be eplit between the office building and the warehouee? <br /> Conclueion: A single FCP will be located downetaire in the <br /> control room. In addition, the 4 fane in the exieting building <br /> will be added to the FCP. <br /> Item 6 : How many fire alarm output aignals will be presented to <br /> the control syetem for euto emoke evacuation? Will there be a <br /> need to heve several zonee requirinq a different emoke ovacuation <br /> echeme than is deecribed in 15985-5 under Atrium Smoke Purge? <br /> Conclusions one general fire alarm eignal will be eent from the <br /> fire alarm panel to the Staefa Control Syetem to initiate the <br /> Atrium Smoke Purge. Upon general alarm: Atrium goes into emoke <br /> evac mode, all other fan eysteme will ehut down. Outside air <br /> intake dampere and exhauet dampere open, and the recirculation <br /> dampers close. <br /> Item 7 : If emoke were to be sensed at one of the duct mounted <br /> emoke detectora end the AHU were elint down ae celled out in <br /> 15985-3, would a command to run from FCP override the emoke <br /> detector(s) and allow the supply or return fan to run7 <br />