Laserfiche WebLink
Conclusion: The FCP will have will have control over the emoke <br /> detectore. <br /> Item 8: Will there be a requirement to poeture the fan eyetems <br /> in the exieting part of the office building while the new office <br /> building fene are in Atrium smoke purge mode? <br /> Conclusion: Yes, the controls eubcontractor will provide <br /> Start/Stop releys to command the 4 exieting fane to off and <br /> poeition the dampere exactly as in item N6 upon the receipt of <br /> the general fire alarm. The question of whether an addreseing <br /> eignal ie desired wae rai3ed. The Owner and the Architect will <br /> give direction on this iesue. <br /> Item 9: Should the pointe deleted from the point liet eo of <br /> addendum 3 in spacification section 15985-11 under SYSTEMS: FAN <br /> CONTROL PANEL be added to ellow the function of the FCP to become <br /> nutomated? <br /> Conclusion: Yee, TRA requeeted a propoeal for thie feature to <br /> monitor the switch poeitione on the FCP and command the fane <br /> based on NOA ewitch poeition. Thie wae acceptable to the fire <br /> department and will be propoeed to the Architect and owner aa <br /> soon ae Martina, Valley, Bowlin, and Guardian can meet. <br /> These minutee reflect my interpretation of the iteme diecuesed <br /> and decisione reached at thie meeting. Any correctione to these <br /> minutes shall be submitted in writing to Martina Enterprises <br /> within two weeke or we will conclude concurrence. <br /> Prepared b Martina Enterprises <br /> �� ' <br /> Ed Edlin <br /> Aeet. Project Manager <br /> cc: All in attendance <br />