Laserfiche WebLink
the access road or fire lane and parkinq lots. <br /> During the final stages of construction, please contact Dick <br /> Thornberry, Crime Prevention Officer at 259-0416 for further <br /> security recommendations. <br /> 19. The Snohomish County PUD currently has sufficient capacity to <br /> serve the proposed development. For information about the <br /> electrical service requirements for this project, Please call Kurt <br /> Martin of the District's Customer Engineerinq Office, Everett at <br /> 258-8291. <br /> 20. GTE Northwest Incorporated has facilities near this location. <br /> However, any building entrances must be coordinated at least 60 <br /> days in advance. The �ost of any relocation of GTE faoilities <br /> that is required to construct the new apartments will be at the <br /> total expense of the developer. Any relocation will take 60 to <br /> 120 days. Please contact Will Helton, Michael Hupf, George Zana <br /> or Debbie Condron, Enqineer-OSP at �56-4053 if you have any <br /> questions regarding this building entrance. <br /> GTE Northwest Incorporated will provide service to the site. <br /> However, new telephone cable construction will be required in <br /> conjunction with the site development. GTE's enqineerinq will <br /> begin when they are notified of your construction schedules and <br /> telepho�e requirements. <br /> It will be the devel.oper's responsibility to provide a suitable <br /> combination of conduit and trenching and/or riser conduit to <br /> accommodate GTE's network communications cable within the complex. <br /> Provided that an acceptable combination of conduit flnd/or <br /> trenching are incorporated into the project to accommodate GTE�s <br /> entrance cable, t,hero will be no costs to th • developer for GTE's <br /> cable. <br /> if a rearranqement of existing cables on premise or on the <br /> right-of-way is necessary, appropriate charges �ill be estimated <br /> and GTE's Guaranty of Payment form will be forwarded to you for <br /> your signature. Prior to commencement of GTE's engineering for <br /> such rearranqement, a deposit will be required. To insure timely <br /> telephone service, GTE requests ninety (90) days ].ead time for <br /> engineerinq, procurement, and installation oY cable and/ or GTE's <br /> equipment. <br /> -8 of 9•- <br />