Laserfiche WebLink
� ( ( <br /> SPECIAL PROPF,RTY USE PF,RMIT � <br /> SPU q03-003 <br /> April 24,2003 <br /> DESCRIPTION OF PROFOSAI.: 7'he proposal is the installation of up to cight pancl antennas on the <br /> rooIlop of an cxisting building. Antcnnas are approximately two feet widc by eight feel lall and will cxtend <br /> approximately ten fcet abovc the roof parapct. An upproximately 11-foot tall, 360 square foot equi ment <br /> shelter will be constructed to store radio equipment. � p <br /> PROPONENT: SMSA Limited Partnership d/b/a Verizon Wirelc� � I6�y <br /> 575 Andever Park West, Suile 201 <br /> Tukwila, WA 98188 <br /> LOCATION: 309 E Casino Road <br /> ZONING: C-1, General Commercial <br /> GENERAL PI.AN: 4.4, Mixed Use Commercial-Mulliple Family <br /> Contnct Person: Steve Ingnlsbe Phone: (425) 257-8731 <br /> SPECIAL PROPERTY USF. GENERAI, EVALUATION CRITERIA <br /> Findines and Conclusions: <br /> The following Gndings and conclusions a�e based on the crileria cslablished in EMC 19.41.150.0 of lhe City <br /> of Everett Zoning Codc: <br /> 1. The need of the ncighborhood, district,or city for a proposed speclal property use. <br /> Pindine: According to the applicant, the proposed wireless communicntion facility will provide necded <br /> capacity relicf for threc surrounding ccll sitcs. <br /> Conclusion: The proposed use provides a public benefit. <br /> 2. The adequacy of streets. •�tifldes and public servlcea required to serve a proposed use. <br /> Findiue: 7'he City right-of-way has been improved to city standards. Public Works has not requested <br /> additional improvements to the City right-of-wAy. Electrical and telephone service is available to serve <br /> the facility. <br /> Conclusion: Cxisting streets, utilitics, and public services are adequute to serve the proposal. <br /> 3. The impact of traflic Renerated by the �roposed ase on t6e surrounding area, pedestrian <br /> circutatlon and public safeq�; and the abilltp of the propuoeot to mitigate such potentirl impacts. <br /> Findin�,; One monthly vchicle trip will be generated to �ervice the faciliry. <br /> Conclusion: The proposed facility will not have n sigr.ificant impact on traffic. <br /> �6 <br />