Laserfiche WebLink
For hirthQr intormatfon, contact the State Fire Marshal's OHice at (360) 5703134 or <br /> contact tho Everett Fire Department at(425) 257-8123.) All such tesls shall be witnessed <br /> by a Fire Depariment inspector. Call (425) 257-8124 lo make an appointmenl for inspeclion. <br /> Contractors' mat=rials and test cerlificales shall be submittsd to the Everelt Fire Department <br /> - prior lo issuance of any Certifica�es of Occupancy. <br /> Call (425) 257-8123 for more information. <br /> 10. Three Unils or Larqer - Size of fire sprinkler service and meler shall be caiculaled by a civil <br /> engineer or fire sprinkler designer who is solely responsible for this calculation. The City <br /> Public Works Departmenl does not review lhese calculalions and is not ihe aulhority having <br /> jurisdiction. All buildings 3 unils or large� ihal are required to have a fire sprinkler must have <br /> a separale fire service. Fire services larger lhan 2" must coniorm to City of Everett Public <br /> Works Slandard 515 anC 523. The fire service side of the system must have a slate- <br /> approved backtlow prevention device. <br /> 11. All fire alarm control panels (fAc;P)and sprinkler valves shall be in healed rooms or closels <br /> with standard man door access. Locations shall be approved by the Fire Marshal's O(fice. <br /> 12. Consttticlion and demolition of buildings shall be in compliance with the provisions of the <br /> 2003 International Fire Code, Chapter 14. <br /> 13. Permils are required from Ihe Fire Depariment for removal and installation of underground <br /> fuel lanks. <br /> 1A. Abandoned lanks shall be pumoed out and the fuel properly disposed of prir„to removal. No <br /> product or rinse water may be disposed of in such a way that it could enter Ihe storm drains <br /> system. <br /> 15. Trash Colleclion - Dumpslers over 1.5 cubic yards capaciry shall be localed a minimum o(5 <br /> (eel from lhe building (IFC 304.3.3, 2003 Edilion]. <br /> GENERAL INfORMATION <br /> 1. Puget Sound Energy is the nalural gas provider in this area. To initiate new service orders. <br /> please conlacl Marilyn ')avis Westlund af (425)356-7512 at leasl 90 days prior to ihe <br /> required in-service date. <br /> Any relocation o( existing gas facililies for lhis development will be al the developer's sole <br /> er.pense, and requires 90 days minimum notice. Please contact Elaine Babby a: (7.U6)224- <br /> 2019 to coordina!e relocation requesls. <br /> 2. The Snohomish County PUD currenUy has sufficfenl capacity to serve the pro�osed <br /> developmenL For turther informalion about the electrical service requirements for this <br /> project, please call Kurt Martin of lhe DistricPs Customer Engineering OKa;, EvereU at 258- <br /> 8291. <br /> 8 <br />