My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
519 E CASINO RD 2016-01-01 MF Import
>
Address Records
>
E CASINO RD
>
519
>
519 E CASINO RD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2017 12:48:13 AM
Creation date
1/25/2017 12:47:44 AM
Metadata
Fields
Template:
Address Document
Street Name
E CASINO RD
Street Number
519
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Verizon Northwesl has(acilities near lhis location. However, any building entrancss musl he <br /> coordinated at least 60 days in advanc.e. Tf�e cosl of any relocalion of Verizon facilities lhat <br /> is requfred lo construd tho new apartments will be at ihe lotal expense of the developer. Any <br /> relocalfon will take 60 l0 120 days. Please contact Mike Hupf, Engineer at (425)356-4052 or <br /> Mike Bly, Engineer at (425)35E-4034 if you have any queslions regarding this building <br /> entrance. _ <br /> 4. Vorizon Northwest will provide service to lhe site. However, new tAlephone cable <br /> construction wili be required in conjunction with !he site cievelopme��l. Verizon's engineering <br /> will begin when they are notified of your cons�ruction schedules and telephone req��irertients. <br /> 5. Il will be the deve�oper's responsibiliry lo p�ovide a suitable combinallon o(conduit and <br /> trenching and/or riser conduit to accommodate Verizon's nelwork communicaQons cable <br /> wilhin the complex. Provided thal an acceplable combfnation oi conduit and/or Irenching is <br /> incorporatad inlu the projecl la accommodate Verizon's entrance cable, there will be no a�sls <br /> to the developer for Verizon's cable. <br /> 6. If a rearrangement of existing �able5 on premises or on the right-of-way is necessary, <br /> appropriate charges will be estimated and Verizon's Guaranty of(�ayment form will be <br /> forvvarded to you for your signature. Prior lo commencoment o(Verizon's engineering for <br /> such rearrangemenl, a dsNosit will be required. To insure lin�ely lefephone service, Verizon <br /> requests ninety(90)days lead time for engineering, procurement, and installation of cable <br /> and/or Verizon's equipment. <br /> Please contact Michael Hupf, Enginaer, at(425)356-4052 or M�ke Bly, Enyineer at (425)35�- <br /> 4034 should you require additional intormalion. <br /> SiFSIAdiQ1WINWORD�SEPMsepa05-045 Cascade Court.doc <br /> q <br />
The URL can be used to link to this page
Your browser does not support the video tag.