Laserfiche WebLink
October 30, 1978 Ili,- Evergreen <br />air or <br />' DUPit everett <br />3100 o[DA. . aft-ffal <br />tvfDm. wASWI.Grom <br />tt:01 <br />DE0A*TMfMr 1 II <br />Mr. Bert Cronin0 <br />iwITif1 <br />Cronin Homes <br />713 South Brc idway <br />Everett, WA 98203 <br />CRONIN DEVELOPMENT ON CASINO ROAD <br />Due to the misunderstanding between Mr. Cronin and the City of Everett and the policy <br />change on the City'ss side to not require a large meter vault and meter at property line <br />in Lome cases (depending on the circumstances), we will accept the new water line and <br />appurtenances if the developer will comply with the following requests. IIowever, no <br />more water lines will be accepted unless the developer provides a set of plans and what- <br />ever else is necessary for the Engineering and Inspection Departments before installa- <br />tion. Our requests are as follows: <br />A. The developer gives the City a 151 easement for the line and any appurten- <br />w:ices (I. c. the hydrant and meter). Additionally, the proposed driveway <br />should be adjusted such that the pavement extends over the new main. <br />B. As builts for the new main must be provided to the Engineering Department <br />by the developer. <br />C. Prior to the City's acceptance of the main, the developer's contractor must <br />excavate to allow visual inspection of the line of at least these three locations <br />(or as directed by the City inspector). <br />1. At the tee at the beginning of the line; <br />2. At the angle; <br />3. At the end of the line including the hydrant and its connection <br />and the meter with its connection. <br />..a <br />