Laserfiche WebLink
Mr. Bert Cronin <br />October 30, 1978 <br />Page two <br />D. Satisfactory hydrostatic and bacteriological test results must be obtained <br />prior to connection to the City's main and the developer must guarantee <br />the main and appurtenances for one year. <br />E. During our first meeting a proposed latecomer's agreement was discussed <br />This should not be considered as the line wa- not installed on the common <br />property line. <br />L. Proper curbing be installed around the hydrant for protection as per con- <br />versation and agreement between Mr. Cronin and myself (also some type <br />of no parking signs so the Lire Department has access to the hydrant at <br />all times. <br />Notes: <br />1. Walt Cooper (Fire Marshal) inspected the location of the hydrant on <br />October 27, 1978. He said the location was o. k. <br />2. The City will expect you to expedite the above requests and coordinate <br />with the Inspection and Engineering Departments. <br />%t r 6-, mil' ,L_� <br />Walter Jr Kro . , Wa:tbr Superintendent <br />cc: Herb Boushey, Director of Operations & Maintenance <br />Clair Olivers, Assistant Engineer <br />Engineering Department <br />Inspection Department <br />