My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
125 W CASINO RD 2016-01-01 MF Import
>
Address Records
>
W CASINO RD
>
125
>
125 W CASINO RD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2017 4:05:37 AM
Creation date
1/25/2017 4:03:52 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
125
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, 2. The Snohomish County PUD currently has sufficient capacity <br /> to serve the proposed development. For further information <br /> about the electrical service requirements for this project, <br /> please call Kurt Martin of the District's Customer <br /> Enqineerinq Office, Everett at 258-8291. <br /> 3. GTE Northwest Incorporated has facilities near this <br /> location. Nowever, any building entrances must be <br /> coordinated at least 60 days in advance. The cost of any <br /> relocation of GTE facilities that is required to construct <br /> the new apartments will be at the total expense of the <br /> developar. Any relocation will take 6o to 120 days. Please <br /> contact Debbie Condron, Enqineer-OSP at 356-4053 if you have <br /> any questions regarding this building entrance. <br /> 4. GTE Northwest incorporated will provide service to the eite. <br /> Hoaever, new telephone cable construction will be required <br /> in conjunetion with the site development. GTE�s engineerinq <br /> will begin when they are notified of your construction <br /> schedulea end telephone requirements. <br /> It will be the developer�a reaponsibility to provide a <br /> suitable combination of conduit and trenching and/or riser <br /> conduit to eccommodate GTE's network communications cable <br /> within the complex. Provided that an acceptable combination <br /> of conduit end/or trenching is incorporated into the project <br /> to accommodate GZE�a entrance cable, there will be no costs <br /> to the developer for GTE's cable. <br /> If a rearrangement of existing cables on premises or on the <br /> riqht-oP-way ie necessary, appropriate charges will be <br /> estimated and GTE�s Guaranty of Payment Porm will be <br /> forrarded to you for your siqnature. Prior to commencement <br /> of GTE�s enqineering Por such rearrangement, a deposit will <br /> be required. To insure timely telephone service, GTE <br /> requests ninety (90) days lead time for engineering, <br /> procurement, and installation of cable and/or GTE's <br /> equipment. <br /> Please contact Michael Hupf, Senior Engineer, at 356-4052 <br /> should you require additional information. <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.