My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1430 W CASINO RD BASE FILE 2016-01-01 MF Import
>
Address Records
>
W CASINO RD
>
1430
>
BASE FILE
>
1430 W CASINO RD BASE FILE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2017 2:54:55 PM
Creation date
1/25/2017 5:13:51 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
1430
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
478
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1\,• <br /> Golde�Assxiatet Ina �j��n A��ta�► <br /> 4104•14Bth Avenun NE �r v�� ��,�,a� <br /> Redmond.WA USA 98054 ��N(�Li(�aa.s <br /> Tetepnone(20h)8BJ•0777 � <br /> faw(20CJ9B2•54GB <br /> November 24, 1992 Our ref: 923-1175 <br /> R[ebe & Aasociatea <br /> 11808 Northup Way, Suite W-360 <br /> Bellevue, Washington 98005 <br /> � �T1'ENTI01`'• h'�r F.�pennu Riebe <br /> � <br /> RE: SUPPLEMENTAL GEOTECHNICAL <br /> i ENGINEERING STUDY <br /> FADtWAY ESTATES PROJECT <br /> EVERETT,WASHINGTON <br /> I <br /> 1 Dear Dennie; <br /> � Golder AaaocSaten Inc. is pleased to present this aupplemental geotechnical engineerin, <br /> , study of the proposed Fainvay Eatates project located in Everett, Washington, as ehown on <br /> Figure 1. The purpoae of thia atudy was to provide additional subaucface informaHon on <br /> I the aite to conRrm our previous site atudy (dated Novemlier 93, 1988), and to meet the <br /> requiremenb of your lender. Our previous ette invesHgaHon,entitled"Geotechnical <br /> Engineering Study,Caatno Road Apettmenb,Everntt, Washington", is attached in <br /> � Appendtz B. We procee�ad W�h�outlilned ogur ecope of wo.•k ur verbal approval of our <br /> � 'November 5, 1992, p p <br /> We completed a previoua geotechnical enbineering atudy of thia site for Centron, dated <br /> Navember 73, 1986. This previoue inve�tigation included the excavaHon of 15 test pit+. To <br /> obtain flnancing from the United Statee Department of Housing and Urban Development <br /> (HLID) for the current project, an addiNonal 34 test pib were required. HLJD requiremenb <br /> etlpulate"at least one bodng muet be made for evtry 2,500 square feet of foundetlon area." <br /> ' Based on our experience working on HUD flnanced projects and prevtoua discuaaione with <br /> Mr. $teve Reece w(th the HUD o�ce of Houafng Architecture in Seattle,Washington, we <br /> � undeistand the following clarificaHone apply to thia requirement: <br /> . Teat pib may be substituted for boringe pravided adequate bearing �oils are <br /> Iencountered. <br /> . The teaults of prevlous eubsudace exploralions can be used for the purpose <br /> � of analyztng site geotechnical conditiona. <br /> . A sufficient number of explorations oE adequate apacial coverage ahould be <br /> i completed to fully characterize the aite geotechnical condi8ona. <br /> i <br /> The deslgn drawinge indicated a totel foundation area of 121,]21 square feet for t e <br /> proposed development. The HL1D requirement of one exploration per 2,500 aquare feet of <br /> I <br /> IOFFICES IN AUSTRALI0.CI�NADA.GERMANV.HUNGARV.R:LV,SYlEDEi�.UNITEO KINGDOM.UNITED STATES <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.