Laserfiche WebLink
ove e 2 923-1175 <br /> Eoundation area indicated a minimum of 49 exploration� were required. Using the original <br /> ' 15 test pit exploraHons,34 additional test pit excavations would be required to satisfy HUD <br /> requiremenb. The test pit� werc excavated adjacent to the proposed buildinga and were <br /> located et intervals considered appropriste to fully characcerize the geotechnical site <br /> � condiHons throughout the limib oE the project. The test pib were not located within the <br /> footprint oE the buildings to avoid disruption and degradation of future foundaHon bearing <br /> eoils. Locating the test pib oubtde of the building faotprint and at spacial intervals <br /> � eufficient to fully charederfze the projeet geotechnical condiNona are coneldered atandard <br /> geoteclm[cel engineerL�g care and pracrice. <br /> , The purpoee of this atudy was to explore the aoil and groundwater conditions at the site by <br /> ezcaveting the additional test�pib and to confirm our odginal geotechntcal engineering <br /> � conclutione and recommendationa. Envitonmental sampling and testing of the soil or <br /> + groundwater were not within the scope of this study. <br /> Baaed on the mults of thia etudy, our odginal geotechnical engineeriug conclusions and <br /> recommendaHons remain applicable to the current project acheme and the proposed <br /> development appean to be feasible for the obaerved site condiHonn. <br /> � SITB LOCATION <br /> The site consisb of appronimately 15 actea and ia located in the eouthweet quadrant of the <br /> i intenecNon of Casino Road and Cherry Wsy in Everett, Waehington. 'fhe aite genetally <br /> alopee to the west from a high of 720 feet elevatlon along the east property line to a low of <br /> 6B4 feet along the weat property Ifne. A small wetland area is located in the central pottion <br /> i � of the property. <br /> PROPOSSD DBVBLOPM6NT • <br /> We undentand the proposed development will conaiat of thirty wood-frame, residentia.! <br /> atructures,acceeeory utility installationa, and paved roadwaye and parking atalla. Five of <br /> the atructuree will be two-atory buildinga. We expect that the building fo�ndation loads <br /> will be telaHvely light and that below grade etructuree will not be required. Grading for <br /> the project,baaed on our review of the Site Plan ahould involve cub and fills of le�s than <br /> six feet. <br /> �IELD BXPLORATION <br /> , Cenerd <br /> The project is being financed through HUD. Minimum soila report tequirements as <br /> sHpulated by HUD require "at least ane boring must be made for every 2,500 aq. ft. of <br /> foundatiort area". Thia would have required at leaat 49 explorations fur th{e project. 15 test <br /> pib were ezcavated during our previoue eite investigation a� shown on Figure 2. An <br /> addiHonal 34 teat pib were excavated to satisfy HUD requiremenb during this study, also <br /> ahown an Figure 2. Due to the shallow depth to competent bearing soil, backhoe <br /> excavated test pib were performed in lieu of boringa. <br /> Golder Assoelafes <br />