Laserfiche WebLink
constructed around the perimeter of the storage area. The atorege area must be located <br /> away from environmentally sensitive areas. <br /> 4. In order to expeaite plan review, e hazardoua materials invrintory list shall be pro��ided as a <br /> paA of the subm�ttal for buflding permits. The storage, handling and usa of haxardous <br /> materials must ts in��ompliance with Article 80 oi the Uniform Fire Code, 7991 Edition. <br /> Ooeration Phase <br /> 5. Dumpsters mu[�t be covered and maintained, so that stortnwater runoff irom refuse does not <br /> enter storm drains or infiltrate fnto soil. <br /> 6. On sites containinp hazerdous materials, procedures to uso in case of spllls musl be <br /> poated. <br /> 7. All chemicals or pruducls of a hazardous or toxic nature that may be used or stored on the <br /> site must be stored under cover end isolated from ihe storm drainege system. <br /> Sectfon 8: PUBLIC SERVICES AND UTILITIES <br /> 8.2 POLICE <br /> 8.2.3 Mitigation Meaaurea <br /> 1. All developments must provide adequate lighting of parking lots and othera ereas which <br /> have an incresaed risk for crime. Illuminetion ahould be a minimum of 3-4 foot candles. <br /> OTHER REQUIREMENTS <br /> 1. A Public Works Permit is required. Detailed drewi�gs in accordance with City Design and <br /> Construction Standards shall be submided to ihe Public Worka Department, showing site <br /> parking layout, londscaping, ulilities, storm drainege, iemporary construction erosion control, <br /> and all required improvementa in the public right-of-way. Public Works Department epproval <br /> of these drawings is required prior to any permits being isaued. All Improvements ahall be <br /> completed, approved and warranted before the Occupancy Pertnit is issued. <br /> , 2. Parking must be per 7.oning Code end Design and Construction Standards lor Development. <br /> 3. This project must co�nply with the City oi Everett Building Code and Sprinkler Ordinance. <br /> 4. Spacial charges for connection to the sewer and waler syatems in accordance with <br /> Ordinance 1998-94 and subsequent revision apply. T'he charges ere based on projected <br /> water usage and can be substantial. Applicant is encouraged to obtain e copy of the <br /> Ordinance and determine estimated charges prior to building pertnit application. The actual <br /> charges shall be computed by the Public Works Department in effect at the time and <br /> according to the .�formation on the approved plans at the time of building pertnit issuance. <br /> 5, A fire hydrant is roquired within 200 driving (eet but not closer than 50 teet of avery <br /> structure. <br /> ;��/�y <br />