Laserfiche WebLink
6. City streets are to be kept clear of dirt and debris al all times during constructlon. Dust <br /> suppression and street cleani�g musl occur as directed by the Public Works Inapector. <br /> 7. A one year warranty is required un the public improvem6nt for an emount not less than 10°h <br /> c�f the c�st of construclion end shall run for one year from the date of finel approval/iasuance <br /> of the fin t Occupancy Permit. <br /> 8. On-site water main will be staked within en easement to the C�:y. The easement witl be <br /> submifl�d to the City prior to issua�ce of permits. <br /> �. As•Guills of storm sewer, senitary sewer, and water systema will be required to be submitted <br /> per City Design end Construction Standarda and Specification for Development. <br /> 10.Any broken or;Jamaged sidewalk shall be repaired/replacod per th9 Nublic Warks Inspedor. <br /> 11.Walkways mus;t be provided from the building entrance to the publie sidewalk. <br /> 12.All exposed ground must be reseeded within 30 day of the completion of construclion. If <br /> reseeding is nul practicai due to weather or seasonal problems, the ground must be covered <br /> with mulch as d�rected by the Ciry Engineer. <br /> 13.Temporary erosion control measures for construction activity must be operational prior to <br /> commencement of any clearing or earthwork. <br /> 74.A traftic mitigation fee of $93,558.00 is required prior to isauence oi the first permit. This tee <br /> may change should changes in the mix of uses shown on the plane occur. <br /> 15.Lack of comment on the attached drainage plans does not indicate epproval of the plans. <br /> 16.A Conslruction Stormwater General Pe'mit administered by the Department of Ecology, will <br /> be required for this project. Additional information as well as an application torm can be <br /> found at www ecv wa 9ovloroarams/wa/stormwater/conslrudion/. <br /> 17.City standards require ireatment of storm water runofl from hydreulically-connected <br /> pavement prior to discharge of the storm water from the site, or to a stream, wetland, or <br /> 1 underground infiltration system. <br /> 18, Storm water treatment is required when 5,000 square feel or more of hydraulically- <br /> connected pavement is created andlor redeveloped by a project. Treatment of storm water <br /> runoH from hydraulically-connected pavement musl occur, per City standards, prior to <br /> discharge of tne storm water irom the site, or to a stream, wetland, or underground <br /> infiltration system. <br /> 19.The options for lreatment of runoff from hydraulically-connected pavement are: <br /> a. An infiitration basin with pretreatmenC, if suitable soils exist on tho site <br /> b. A wetpond <br /> c. A constructed weUand <br /> d. A storm water technelogy thet has received a GULD (General Use Level Designation) <br /> from the Washington State Departme�t of Ecology for either basic or enhanced <br /> treatment with prelreatment'. <br /> � ��� <br />