Laserfiche WebLink
INFORMATION FOR DEVELOPEt <br /> The folluwing information is provided for the developers b�nefit. The proposal must comply <br /> with all ordinances in effect at the time a complete buildin� permit application ia fded, including <br /> those not identified below. Contact the Planning Departrr,�:nt for information regarding appeals <br /> processes tor the requirements listed in this document <br /> AGENCIES WITH JURISDICTION <br /> 1. A Nationel Pollutant Discharge Elimination System (NPDES) permit, administared by the <br /> Washinglon Stote Department of Ecology, will probably be required for clearing and grading <br /> on this site if the area disturbed is greater tlian or equal to one acre. <br /> APPLICABLE CONDITIONS FROM 3W EVERETT MITIGATION DECISION DOCUMENT <br /> Section 1: LAND USE <br /> 1.1 Thresholda <br /> Nei9ht o(BuildinaslSlructures <br /> Additional SEPA analysis is required tor any structure that the FAA determines may have a <br /> significa�t adverse eHect on nevigeble airspace around Peine Field Airpor. <br /> 1.3 Mltlgation Measuree <br /> 1. Height: All development with structures more than 200 feet in height a�d those wilhin 20,000 <br /> feet of Paine Field must check with the FAA to determine if nolification is requfred. <br /> 2. Rockeries and retaining walls greater than 4 feet in height end 40 feel in length lhet are <br /> visible irom adjacent properties or public right of way shall be substantially screened with <br /> landscaping or architecturally designad and landscaped to break up the appearance of <br /> length/height in a manner approved by the Planning Director. Rockeries and retaining wails <br /> within required landscape areas shall not be counled in the required landacaping width. <br /> 3. If any archaeotogir,al resources or human remains are found during construction, the project <br /> proponent shall contact the Tulalip Tribea, the City of Everett Planning and Community <br /> � Development Departmenl, and the State Office of Archaeology end Hiatoric Preaervation. <br /> This conlect will initiate a consultation process for determining subsequent ections. <br /> Sectfon 2: TRANSPORTATION <br /> 2.3 Mitlgatlon Measures <br /> t. All development must pay a fee of$1,006.00 per PM peak hour irip ta fund system-wide <br /> transportation improvements (See total tee below). <br /> 2 Transit routes/schedules and high occupancy vehicle information must be prominently <br /> displayed fer employees at on-site commute information centers end near asaociated <br /> walkways. Preferential parking space localions tor carpoots and vanpools musl be provided <br /> on all sites. Buildinga must incorporete bicycle end pedestrian amenities such as lockers, <br /> shower rooms, and bicycle stands. <br /> �' 31/y <br />