My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2501 W CASINO RD 2016-01-01 MF Import
>
Address Records
>
W CASINO RD
>
2501
>
2501 W CASINO RD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2017 9:20:28 AM
Creation date
1/25/2017 9:19:27 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
2501
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�_ — <br /> r <br /> , GEOTECHNICAL ENGINEERiNG STUDY <br /> Told Development E�888 <br /> � May 8, 1990 Page 3 <br /> � is about fourteen 14 feet. Present vegetaticm m�sists of deciduous trees on the wr.st, fruit <br /> uees to the north, and brush covering the remainder of the aite. <br /> rRubsurface <br /> The site was explored by excavating nine test pits at the approximate locations shown nn ;*: <br /> � Plate 2. Plcase refer to the Test Pit [.ogs, Plates A2 through A6, for a more detailed �:k <br /> description of the conditions eqcountered at each location explored. A description of the " <br /> � field expioration methods and laboratory testing program is included in the appendix of this <br /> report. The following �s a generalized description of the subsudace conditions encountered. <br /> Our test pits generally encountered three to twelve (12) inches of organic topsoil composed <br /> , of dufL The topsoil covered two to three feet of wet to saturated red-brown silty sand in <br /> a loose rnndition. Ttiese two su�cial soil layers overlie four to six feet of gray, fine to <br /> medium silty sand with gravel, a few cobbles, and occasional boulders. The deeper soil is <br /> � classified as a dense glacial dll and was in a moist to wet condition at the top of the secdon. <br /> Groundwater <br /> � The perched seepage level observed while excavating was about two to three feet below the <br /> existir�g surface and is shown on the test pit logs. The perched seepage level is not static <br /> � and wi11 fluctuate depending on the season, amount of rainfall, surface water runoff, and <br /> other factors. Generally, the water level is higher in the wetter winter months (October <br /> through May). <br /> � <br /> DiSC ION ND F p]►•h• T*pAT101V4 <br /> � S�Dgtel <br /> � Based on the rnnditions found during of our exploration and the results of our analyses, it <br /> is our opinion that the proposed structures can be supported on spread and continuous <br /> footings bearing on the dense to very dense silry sand and gravel located about two to three <br /> � feet below the surface, or on a structural GIl placed on the silry sand. Wet to saturated soil <br /> extends from the surface te the top of the till at a depth of about three feet. Water is <br /> p,:rched on the surface of die till. Floor slabs az�d pavements should be supported on at <br /> � least ane foot of structural fili. <br /> Interceptor surface ditches and subsurface drains should be installed on the uphill portion of <br /> � the site before construction stans. These, and other geotechnically-related aspects of the <br /> project are discussed in more detail in the following sections of this report. <br /> I <br /> r Earth Conaultants, Inc. I <br />
The URL can be used to link to this page
Your browser does not support the video tag.