Laserfiche WebLink
��� <br /> v�x ' <br /> c H <br /> � H�CV� <br /> HZ� <br /> fC C] <br /> oH� • <br /> '�tl ���-+ � <br /> yyC <br /> C�1�p <br /> H <br /> ON <br /> ��g « <br /> (�]Y (� <br /> N 1. Introduction. <br /> yH <br /> r H H The proposed mitigation plan is based on the wetlands <br /> gdydelineation made by the Coot Company and agreed to by the <br /> �� � • Washington Department of Ecology and conditions set forth by <br /> r� the City of Everett and the Washington Department of Ecology <br /> '3 o y during the wetland negotiations. <br /> 2. Existing Conditione. <br /> r <br /> Currently the site has three separate wetlan areas. <br /> They are located in the northwest, in the south center, and in <br /> the southeast portions of the site. The south center and the <br /> southeast wetlands are connected throuqh a culvert under <br /> .. Casino Road to the City of F.verett storm and drainage system. <br /> After heavy rains or extended rains, there is the probability <br /> that the northwestern wetland overflows into the two southern <br /> most wetlands on the site. <br /> i ; � The site slopes from the northwest to the southeast. <br /> There are two upland areas on the sitei one located in the <br /> '�1 northeast corner of the site , while the second is loc3ted <br /> along the west property boundary. The :.ite's contours follow <br /> ��' the configuration of the wetlands ending with the lowest <br /> '�' � depression being in the southeastern most wetland abuttiny <br /> + Casino Road. The highest elevatlons are in north and west <br /> ��1 sides with the highest point being in roximatehelevationeof <br /> '-1 The hiyhest point of the site has an app <br /> 584 feet with the entire north boundary and the west boundary <br /> � � being in excess of elevation 565 feet. <br /> ��' 3, proposed Project. <br /> �' The proposed projecL• includes the construction of two <br /> �' � large buildings on the site. The larger of the two buildinqs <br /> �' will be built along the north property boundary with the <br /> � smaller building being built in the southwest corner of the <br /> site abutting Casino Road and Paine Field IIusiness Park, Phase <br /> I . <br /> � <br /> 4. Impacts Analysis. <br /> 1 <br /> ! <br />