My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2525 W CASINO RD BASE FILE 2018-01-01 MF Import
>
Address Records
>
W CASINO RD
>
2525
>
BASE FILE
>
2525 W CASINO RD BASE FILE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2019 1:17:18 PM
Creation date
1/25/2017 9:33:23 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
2525
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� �Ha <br /> C H <br /> � Hy <br /> H �� <br /> �C C] <br /> H� <br /> �M� <br /> �y � � . <br /> � <br /> � <br /> OM <br /> ��g <br /> yM r <br /> y ?. Constnictiort Procedures. <br /> rHH <br /> N <br /> � y The majority oC the E�rocedures that have been discussed <br /> ��j in the design plan are: <br /> r� tn � <br /> '�o"' ? . The wetland mitigation site/detention area will be <br /> constructed prior to grading of the site. The area will be <br /> temporarily modified to act as the temporary eroslon control <br /> devise. <br /> ~ 2 . All trees and shruba that are proposed to be <br /> salvaged will be ear-marked, removed , and replanted into the <br /> mitigation wetland. This work will be supervised by the <br /> landscape construction foreman and a wetland bioloqist. <br /> P+ 3. The base material in the northwest wetland will be <br /> excavated and spread in thoae areas of elevation 561 or less <br /> � 1 with the exception of the existing wetlands which will be <br /> ' ' retained undisturbed. <br /> '�' ~ 4 . After site grading and construction, i.e. the <br /> 1 ' completion of paving, the mitigation area will be checked and <br /> � cleaned. The temporary sedimentation areas will be removed at <br /> '�` this time. The control structure Areas will be over-excavated <br /> � ... and back-filled with top soil to remove the poten*.ial of oils <br /> ��' or other contaminants that may have entered the site during <br /> � construction being retained in the lower soil profile after <br /> '�' the mitigation area is completed. . <br /> '�' ,� 5. Shrubs and trees will be either replanted or <br /> introduced , depending on the species , starting with the <br /> ��� interior trees on the elevations 562 to 5G4 and ending wit'� <br /> � the planting of the buffer area. Trees that are handled by <br /> � � heavy equipment will be planted first. All trees 10 feet or <br /> ��' -- taller will be staked and anchored ueing self-deatructive <br /> ma�erials such as cotton twine or cloth. Each tree will be <br /> wrapped with burlap to prevent twine from rubbing through the <br /> bark and killing the tree. Nursery trees and shrubs that can <br /> be hand planted will be planted last. <br /> B <br />
The URL can be used to link to this page
Your browser does not support the video tag.