Laserfiche WebLink
�� 5 <br /> O� a <br /> G H <br /> �Hti <br /> H� � <br /> K C! <br /> H � <br /> �H '� � <br /> �y � <br /> o� <br /> H <br /> OH <br /> ��g <br /> L1� O � <br /> �' 6. Once the area is completely planted, the 25 foot <br /> gH <br /> i..iy buffer will be over �eeded with a grasa mix. Once the grass <br /> y H area is seeded, slips of emall cottonwood and willow will be <br /> �� �' plugged into the areas. <br /> � � <br /> � y 7 . The grass-lined swale will be planted at this <br /> time. <br /> 10. Itrigation. <br /> � A temporary irrigation system will be constructed using <br /> city water. The system will consist of PVC pipe and rain- <br /> bird heads located as necessary to get ]00 percent coverage. <br /> The irrigation will be conducted on the same cycle as <br /> ., irriga'cion for formal plantinge. The system will be designed, <br /> if needed just prior to its installation. Its funct'.on will <br /> be temporary. <br /> �w� 11. Monitoring. <br /> '�' " ,ro ram will be initiated at tlie <br /> The monitoring E 9 <br /> � 1 completion of the planting. At that time, a timP-zero report <br /> 1 ' will be completed by the planter and the design biologist. <br /> � Phe time-zero report will identify problems in obtaining <br /> '�' �, materials , differencea in sizes of materials than were <br /> 1 ' originally called for, difference in spacing of materials than <br /> � were originally called for , replacement materiale if <br /> '� necessary, and any other conditions that varied froni the <br /> �' mitigation plan . ( If there is a major change 1n the <br /> � �. mitigatfon plan, this change will have tu be agreed to by the <br /> f�' City of Everett before proceeding.l <br /> ��� Transects will be located at the following locations: <br /> ' 1 � in the south end through the undisturbed portion ot tlie <br /> ' .. wetland and in the deepest water area of the wetland . <br /> 2) across the center peninsula and the narrow neck of wetland <br /> 3) acroes the north end next to the toe of the slope <br /> Additional individual monitoring pointa will be situated at <br /> the outlet structure and the inlet of each grasc-1�udln9athe <br /> � The sw��es will be monitored ir, their er,tirety <br /> first year. <br /> 9 <br /> � <br />