My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2525 W CASINO RD BASE FILE 2018-01-01 MF Import
>
Address Records
>
W CASINO RD
>
2525
>
BASE FILE
>
2525 W CASINO RD BASE FILE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2019 1:17:18 PM
Creation date
1/25/2017 9:33:23 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
2525
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�� 5 <br /> O� a <br /> G H <br /> �Hti <br /> H� � <br /> K C! <br /> H � <br /> �H '� � <br /> �y � <br /> o� <br /> H <br /> OH <br /> ��g <br /> L1� O � <br /> �' 6. Once the area is completely planted, the 25 foot <br /> gH <br /> i..iy buffer will be over �eeded with a grasa mix. Once the grass <br /> y H area is seeded, slips of emall cottonwood and willow will be <br /> �� �' plugged into the areas. <br /> � � <br /> � y 7 . The grass-lined swale will be planted at this <br /> time. <br /> 10. Itrigation. <br /> � A temporary irrigation system will be constructed using <br /> city water. The system will consist of PVC pipe and rain- <br /> bird heads located as necessary to get ]00 percent coverage. <br /> The irrigation will be conducted on the same cycle as <br /> ., irriga'cion for formal plantinge. The system will be designed, <br /> if needed just prior to its installation. Its funct'.on will <br /> be temporary. <br /> �w� 11. Monitoring. <br /> '�' " ,ro ram will be initiated at tlie <br /> The monitoring E 9 <br /> � 1 completion of the planting. At that time, a timP-zero report <br /> 1 ' will be completed by the planter and the design biologist. <br /> � Phe time-zero report will identify problems in obtaining <br /> '�' �, materials , differencea in sizes of materials than were <br /> 1 ' originally called for, difference in spacing of materials than <br /> � were originally called for , replacement materiale if <br /> '� necessary, and any other conditions that varied froni the <br /> �' mitigation plan . ( If there is a major change 1n the <br /> � �. mitigatfon plan, this change will have tu be agreed to by the <br /> f�' City of Everett before proceeding.l <br /> ��� Transects will be located at the following locations: <br /> ' 1 � in the south end through the undisturbed portion ot tlie <br /> ' .. wetland and in the deepest water area of the wetland . <br /> 2) across the center peninsula and the narrow neck of wetland <br /> 3) acroes the north end next to the toe of the slope <br /> Additional individual monitoring pointa will be situated at <br /> the outlet structure and the inlet of each grasc-1�udln9athe <br /> � The sw��es will be monitored ir, their er,tirety <br /> first year. <br /> 9 <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.