Laserfiche WebLink
�� � <br /> O� x � <br /> C9 H <br /> t"yy � <br /> �o� � <br /> 'il H � � <br /> N <br /> z <br /> �� e � <br /> ��� � tree will be wrapped with Uurlap to prevent twine from <br /> �H� zubbing through the bark and killing the tree. Nuisery trees <br /> �y H and shr�bs that can be hand planted will be planted last. <br /> N <br /> � d�' 6. Once the area is completely planted, the 25 foot <br /> �y ��"j buffer will be over seeded with a yrass mix. <br /> HO �n <br /> 7. Once the grass area is seeded , �lips of small <br /> cottonwood and willow will be plugged into the areas. <br /> 8. Depending-on fhe time of construction, a temp�rary <br /> irrigation system may be installed to„assure that the area is <br /> ` watered sufficienE7y to increase the� survivability of the <br /> � plants, particularly the large plants. ;, ; � % <br /> ` , <br /> � 10. Irrigation. (:' `� .— <br /> � i 1 ,.Cr --., �. � r� �i� .. . <br /> � . 1,� . . �,Y`:� -' � � .l.ci�,�' �� •'-' <br /> A temporary irrigation sys�em will be cbnstructed using : � <br /> .. � city water. The system will consist of PVC pipe and rain- _ ,_, � ' <br /> � � � bird heads located as necessary to yet 100 percent coverage. � <br /> � ' � The irriaation will be conducted on the same cycle as'�� <br /> I irrigation for formal plantings. The system will be designed,� '" ! <br /> � � if needed just prior to its instal:ation. Its function will . <br /> ��' I be temporary. � ;� :. <br /> � 1 11. Monitoring. <br /> 1�' The monitoring program will be initiated at the <br /> �, completion of the planting. At that time, a time-zero report <br /> � will be completed by the planter and the design biologist. <br /> �' The time-zero report will identify problems in obtaining <br /> �' materials , differences in sizes of materials than were <br /> ' originally called for, difference in spacing of materials than <br /> were originally called for , replacement materials if <br /> �' necessary, and any other conditions that varied from the <br /> mitigation plan . ( If there is a major change in the <br /> � mitigation plan, this change will have to be agreed to by the <br /> City of Everett and Washington Department of Ecology before <br /> proceeding. ) <br /> 8 <br />